Design & Build

The same team carries the plan into buildings

Design starts from a measured site, supervision checks the work with instruments, and construction is set out by our own surveyors: one team, responsible from first survey to hand-over.

One team

From plot to keys

Join at any step. Each one is easier when the earlier steps were done by the same people.

  1. 01

    Survey

    Boundaries and levels of the plot measured.

  2. 02

    Design

    Architecture and interiors designed on the measured site.

  3. 03

    Approval

    Drawings prepared for the building authority.

  4. 04

    Build

    Construction set out by our surveyors and built to the drawings.

  5. 05

    Supervise

    Stage inspections before work is covered, with written records.

Why one team

Where building projects usually go wrong

Most disputes on a building site trace back to a handover between parties. The surveyor gave a boundary but not the levels the drainage needed. The architect drew a basement the soil report never supported. The builder set out from a tape and a guess because nobody gave him coordinates. Each party did its own job; nobody owned the gap between the jobs.

We keep those gaps inside one team. The people who measured the plot are the people who set out the foundations, and the drawings they build from were prepared on that measurement. When a question comes up on site, someone present knows why a wall was drawn where it is, and can decide without a week of messages.

Joining at the step you need

You do not have to give us the whole project. Some owners bring finished drawings and want construction with proper setting out. Others have a builder already and want only project supervision to check the work independently at each stage. Owners living abroad often want both, with written progress reports they can read without visiting. Early advice on feasibility, budgets and approvals sits under consultancy.

What a good record looks like

Whoever builds for you, ask for three things in writing: the coordinates and levels the work was set out from, an inspection note for each stage before it was covered (footings, reinforcement, services), and as-built drawings at the end. The first lets anyone check the building against the design. The second is the only evidence of what is now buried in concrete. The third is what you will need for any later extension, sale or completion certificate; our guides cover the surveys and approvals that sit around a build.

Which service answers which problem

If the owner cannot say what a house will cost or whether the plot allows it, the need is advice before drawings, and that is consultancy. If the plot is measured and the brief is clear, architecture turns it into drawings the building authority can approve, and interior design fixes the finishes, joinery and services points before walls are plastered. If the drawings exist and the question is how to build them accurately, construction starts with setting out from control points. If a contractor is already working, the open question is whether anyone independent is looking, and that is project supervision.

Why measuring first changes the design

Slope decides where a basement is practical and where water will run after rain. Boundaries decide the setbacks the authority will apply. Buried pipes and cables decide where a foundation can go without a diversion, which is what an underground utility survey shows before excavation. After the build, an as-built survey records what was actually constructed, which is the document later extensions, sales and completion applications depend on.

Questions to settle before the first excavation

Most building problems are cheap to prevent in the week before work starts and expensive to repair after the slab is cast. Four questions are worth answering in writing with whoever is building for you. Which drawings are the approved set, and who holds the latest revision? From which control points will the building be set out, and who checks them? Which stages may the builder not cover until someone independent has looked, such as footings, column reinforcement, slab steel and buried drains? And who has the authority to stop a pour if a check fails?

A written answer to each turns a verbal promise into something an owner can point to later. It also shows early whether the builder is used to being checked. A contractor who welcomes inspection points usually has nothing to hide, and one who resists them has told you something useful before any money is spent.

Owners who are not on site

Many of the people who ask us for help are overseas or work in another city, and build through a relative or a contractor they cannot watch. For them the risk is not dishonesty so much as drift: a column shifted to suit a shuttering board, a floor level changed because a drain was laid too high, a bar spacing relaxed because steel was short that day. Each change looks small and none is recorded. Dated reports with photographs, taken at the stages that matter and sent to the owner, are the practical remedy, because they let a person who cannot visit still see what was done and ask about it while it can be corrected.

How the services fit together in time

Advice comes first, while the budget and the approvals are still open. Architecture follows on the measured plot. Interior design should overlap the end of architecture, because the position of sockets, drainage points and built-in joinery has to be fixed before the walls go up. Construction needs the approved drawings and the setting-out control. Supervision runs alongside it from the first excavation. The as-built record closes the job. Seeing the order this way makes it easier to judge which step you are actually at and which ones you can safely leave out.

Tell us the plot, the drawings you have and the stage you are at through the contact page, and we will say honestly which of these services you need and which you do not.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.