Design & Build

Construction

We build what we survey and design: homes, commercial and institutional buildings, and the roads, drains and services of housing schemes. Our own surveyors set out the work and check levels, and the same team that prepared the drawings answers questions on site, so the building matches the design and problems are solved by people who know why it was drawn that way.

Published · RN Tech Associates surveying and planning team

Two high-rise towers under construction with tower cranes

Key facts

Builds
Houses, commercial and institutional buildings, scheme infrastructure
Setting out
By our own surveyors, from the design coordinates
Quality
Stage inspections before work is covered
Records
Progress and inspection reports, as-built drawings at completion
Same team
Survey, design and construction under one roof

One team from survey to hand-over

When survey, design and construction are done by different firms, problems fall between them: a level the surveyor did not take, a detail the architect did not draw, a builder who guessed. We do all three, so there is one team responsible for the result.

Set out by surveyors

Our own surveyors set out the work from the design coordinates and check levels as it goes up. That removes the most common source of expensive mistakes on site.

Inspected and recorded

Each stage is inspected before it is covered, and recorded, including the frame and band details that Seismic Zone 2B in Islamabad and Rawalpindi calls for. At completion you receive as-built drawings of what was actually built.

Building to the code that applies

Houses and commercial buildings in Islamabad and Rawalpindi are designed for earthquakes, and the rule is written down. The Capital Development Authority’s building control regulations say, at clause 4.1.17, that the provisions of the Pakistan Building Code shall be followed for safety against earthquakes (CDA, ICT Building Control Regulations 2020 as amended by S.R.O. 1074(I)/2023, Gazette of 16 August 2023). The code’s seismic provisions were notified by S.R.O. 971(I)/2008 and place the twin cities in Zone 2B, while the hill tehsils of the same district, such as Murree, fall in Zone 3 (Pakistan Building Code, Seismic Provisions 2007, Table 2.2).

In practice this reaches the site in a few ways. The code exempts one-family dwellings from its seismic design only in Zone 1 (section 5.29.1), so a house in Zone 2B is not exempt. Reinforced concrete frames in Zone 2 must be at least intermediate moment-resisting frames (section 5.33.2.7), which governs how closely stirrups are spaced at beams and columns. Load-bearing brick houses fall under masonry Category C, which limits openings and requires bands and vertical steel. A builder who works from habit rather than from the drawings will miss these details, and they cannot be fixed once plaster is on.

What setting out and level control mean on a plot

Setting out is the step that turns a drawing into pegs on the ground. Our surveyors work from control points fixed on or near the plot, put out the corners of the building and the centre lines of walls and columns, and give the builder a reference level so that plinth, floor and drain levels all come from one datum. They return to check columns for position and the structure for level as it rises. An error found at the foundation costs a morning; the same error found at the roof costs the wall.

Levels matter as much as positions. Drains fall by gravity, so a plinth set too low can leave a house below its own sewer. Road and drain levels in a scheme come from the approved layout and its services designs, and we set those out from the same coordinates the layout was drawn on.

Stages we inspect before work is covered

Some work can be checked only while it is visible. We inspect and record these stages before they disappear:

Stage What is checked before it is covered
Foundations Position and level against the setting out, excavation depth, soil as found compared with the design assumption
Reinforcement Bar size, spacing, cover and laps against the structural drawings
Services in walls and slabs Conduits and pipes in the position drawn, so later cutting is not needed
Damp-proofing and slab edges Layers in place and levels correct before the finishing course

Each inspection produces a written note, and the notes are handed over with the as-built drawings. If you later sell, extend or apply for a completion certificate, those records are the evidence of what is inside the structure.

What we need from you to quote

Send the approved drawings if you have them, the plot location and size, and the stage you want us to join. If drawings are not ready, we can prepare them under architecture first. We do not quote from a phone call alone, because the right price depends on drawings, soil and access, and a figure given without them is a guess. Use the contact page or WhatsApp and we will tell you plainly what is needed.

One team from design to hand-over

Construction follows the architecture and interior design drawings, and is set out by our surveyors using the engineering survey control. Owners who want an independent check can add project supervision. Buried services are located beforehand with an underground utility survey, and at completion an as-built survey records what was built. See all our design and build services. Before you sign with any builder, our guide to what a house construction contract should say lists the clauses to agree. Send your drawings or plot details through the contact page for a quote.

How it works

How the work runs

  1. 01

    Drawings and scope

    Approved drawings, specifications and scope agreed.

  2. 02

    Programme

    Sequence, timeline and inspection points planned.

  3. 03

    Set out

    Our surveyors set out the work from the design coordinates.

  4. 04

    Build and inspect

    Work built and inspected stage by stage.

  5. 05

    Hand over

    Completion, as-built drawings and hand-over.

When you need it

Who asks for this, and why

  • Homes

    A house built to the drawings, with levels and setting out checked by survey.

  • Commercial and institutional

    Buildings delivered with stage inspections and records.

  • Scheme infrastructure

    Roads, drains and services for housing schemes, set out from the approved layout.

  • Owners abroad

    Construction managed and reported for clients living outside Pakistan.

Questions

Construction: common questions

01Why use the same team for design and construction?

Questions on site are answered by people who know the design and the site, setting out comes from the design coordinates, and responsibility is not split between parties who blame each other.

02Do you build housing scheme infrastructure?

Yes. Roads, drains and services set out from the approved layout plan.

03How do you control quality?

Stage inspections before work is covered, setting out and levels checked by our surveyors, and written records of each stage.

04Do you provide as-built drawings?

Yes, at completion, measured by our surveyors.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.