One team from survey to hand-over
When survey, design and construction are done by different firms, problems fall between them: a level the surveyor did not take, a detail the architect did not draw, a builder who guessed. We do all three, so there is one team responsible for the result.
Set out by surveyors
Our own surveyors set out the work from the design coordinates and check levels as it goes up. That removes the most common source of expensive mistakes on site.
Inspected and recorded
Each stage is inspected before it is covered, and recorded, including the frame and band details that Seismic Zone 2B in Islamabad and Rawalpindi calls for. At completion you receive as-built drawings of what was actually built.
Building to the code that applies
Houses and commercial buildings in Islamabad and Rawalpindi are designed for earthquakes, and the rule is written down. The Capital Development Authority’s building control regulations say, at clause 4.1.17, that the provisions of the Pakistan Building Code shall be followed for safety against earthquakes (CDA, ICT Building Control Regulations 2020 as amended by S.R.O. 1074(I)/2023, Gazette of 16 August 2023). The code’s seismic provisions were notified by S.R.O. 971(I)/2008 and place the twin cities in Zone 2B, while the hill tehsils of the same district, such as Murree, fall in Zone 3 (Pakistan Building Code, Seismic Provisions 2007, Table 2.2).
In practice this reaches the site in a few ways. The code exempts one-family dwellings from its seismic design only in Zone 1 (section 5.29.1), so a house in Zone 2B is not exempt. Reinforced concrete frames in Zone 2 must be at least intermediate moment-resisting frames (section 5.33.2.7), which governs how closely stirrups are spaced at beams and columns. Load-bearing brick houses fall under masonry Category C, which limits openings and requires bands and vertical steel. A builder who works from habit rather than from the drawings will miss these details, and they cannot be fixed once plaster is on.
What setting out and level control mean on a plot
Setting out is the step that turns a drawing into pegs on the ground. Our surveyors work from control points fixed on or near the plot, put out the corners of the building and the centre lines of walls and columns, and give the builder a reference level so that plinth, floor and drain levels all come from one datum. They return to check columns for position and the structure for level as it rises. An error found at the foundation costs a morning; the same error found at the roof costs the wall.
Levels matter as much as positions. Drains fall by gravity, so a plinth set too low can leave a house below its own sewer. Road and drain levels in a scheme come from the approved layout and its services designs, and we set those out from the same coordinates the layout was drawn on.
Stages we inspect before work is covered
Some work can be checked only while it is visible. We inspect and record these stages before they disappear:
| Stage | What is checked before it is covered |
|---|---|
| Foundations | Position and level against the setting out, excavation depth, soil as found compared with the design assumption |
| Reinforcement | Bar size, spacing, cover and laps against the structural drawings |
| Services in walls and slabs | Conduits and pipes in the position drawn, so later cutting is not needed |
| Damp-proofing and slab edges | Layers in place and levels correct before the finishing course |
Each inspection produces a written note, and the notes are handed over with the as-built drawings. If you later sell, extend or apply for a completion certificate, those records are the evidence of what is inside the structure.
What we need from you to quote
Send the approved drawings if you have them, the plot location and size, and the stage you want us to join. If drawings are not ready, we can prepare them under architecture first. We do not quote from a phone call alone, because the right price depends on drawings, soil and access, and a figure given without them is a guess. Use the contact page or WhatsApp and we will tell you plainly what is needed.
One team from design to hand-over
Construction follows the architecture and interior design drawings, and is set out by our surveyors using the engineering survey control. Owners who want an independent check can add project supervision. Buried services are located beforehand with an underground utility survey, and at completion an as-built survey records what was built. See all our design and build services. Before you sign with any builder, our guide to what a house construction contract should say lists the clauses to agree. Send your drawings or plot details through the contact page for a quote.