Seismic zone of Islamabad and Rawalpindi: what Zone 2B in the Building Code of Pakistan means for a house

Published · 9 min read · RN Tech Associates · in Building and approvals

Short answer

The seismic zone of Islamabad and Rawalpindi is Zone 2B in the Building Code of Pakistan, Seismic Provisions 2007: a design ground acceleration of 0.16g to 0.24g and a zone factor of 0.20. Murree and Kotli Sattian tehsils are Zone 3. In 2B even a single family house must meet the seismic rules: at least intermediate concrete frames, or banded brick walls under Category C.

Seismic zone of Islamabad and Rawalpindi: what Zone 2B in the Building Code of Pakistan means for a house

Key points

  • Table 2.2 of the 2007 Seismic Provisions puts Islamabad and the tehsils of Rawalpindi, Taxila, Kahuta and Gujar Khan in Zone 2B; Murree and Kotli Sattian are Zone 3.
  • Zone 2B means a design peak ground acceleration of 0.16g to 0.24g, for shaking with a 10% chance of being exceeded in 50 years.
  • Only one and two family houses in Zone 1 are exempt. In 2B a house is designed for earthquakes like any other building.
  • Concrete frames in Zone 2 must be at least intermediate moment-resisting frames; brick bearing-wall houses fall in Category C, with set mortar, opening limits and bands.
  • The code was made binding on engineering design by S.R.O. 971(I)/2008, and CDA's building regulations require it in Islamabad. PEC has published a 2021 code; we found no notification of it.

The seismic zone of Islamabad and Rawalpindi, from the code itself

The seismic zone of Islamabad is 2B, and so is Rawalpindi. Both come from Table 2.2 of the Building Code of Pakistan, Seismic Provisions 2007 (BCP SP-2007), which lists the zone of every tehsil in the country. The code divides Pakistan into five zones by peak ground acceleration (PGA), the strongest horizontal shaking the ground is expected to reach. It designs buildings for shaking with a 10% chance of being exceeded in 50 years, a return period of about 475 years (section 2.2 and Appendix A).

Zone Peak ground acceleration (Table 2.1) Zone factor Z (Table 5.9) Examples from Table 2.2
1 0.05g to 0.08g 0.075 Fort Abbas
2A 0.08g to 0.16g 0.15 Lahore City, Multan City, Faisalabad City
2B 0.16g to 0.24g 0.20 Islamabad, Rawalpindi, Taxila, Kahuta, Gujar Khan, Attock, Jhelum, Chakwal, Haripur, Peshawar
3 0.24g to 0.32g 0.30 Murree, Kotli Sattian, Abbottabad, Mansehra, Quetta
4 more than 0.32g 0.40 Muzaffarabad, Bagh, Balakot

“g” is the acceleration due to gravity, so 0.20g is a fifth of it. For the twin cities and the country around them, these are the rows that matter:

Tehsil (Table 2.2) Zone Tehsil (Table 2.2) Zone
Islamabad (Federal Area) 2B Murree 3
Rawalpindi 2B Kotli Sattian 3
Taxila 2B Attock, Hassanabdal, Fateh Jang 2B
Kahuta 2B Jhelum, Dina, Sohawa 2B
Gujar Khan 2B Haripur 2B
Chakwal 2B Abbottabad 3

Two notes from reading the table. It uses the tehsil names of 2007, so a tehsil created later is not listed; use the zoning map (Figures 2.1 and 2.2) or the tehsil it was carved from, and ask your engineer to confirm. And a site-specific hazard analysis, where one is done for a large project, supersedes the map (section 2.4). Nobody does one for a house.

Is it zone 3? Where the confusion comes from

Search for the seismic zone of Islamabad and you will find “zone 3” in news reports, and research papers giving site hazard values above 0.3g for parts of the twin cities. Neither is the zone the code assigns for design. The news reports date from before or just after the 2005 earthquake, when the zoning was being redrawn. The research values come from different methods and return periods; they are useful for planners, but the design zone is the one in Table 2.2, and that is 2B.

The practical error runs the other way too. Because Lahore is 2A and the twin cities are 2B, a structural design copied from a Lahore house is not automatically right for a plot in Islamabad or Rawalpindi. The zone factor rises from 0.15 to 0.20, and the hills a few kilometres north are Zone 3.

What the code is, and who it binds

BCP SP-2007 was written after the October 2005 earthquake by NESPAK for the Ministry of Housing and Works, vetted by the Pakistan Engineering Council (PEC) and based on the US Uniform Building Code 1997 and ACI 318-05 (its preface). According to PEC, the federal cabinet approved it on 9 August 2007.

Three instruments give it force:

  1. S.R.O. 971(I)/2008 of 8 September 2008 added bye-law 10 to PEC’s bye-laws for consulting engineers: the Seismic Provisions “shall apply for engineering design of buildings, building like structures and related components”, and construction in violation of the code is a violation of professional engineering work under the PEC Act. The same S.R.O. says the code is to be revised every five years or earlier.
  2. In Islamabad, clause 4.1.17 of CDA’s Building Control Regulations 2020, as amended by S.R.O. 1074(I)/2023, reads in full: “Provisions of PAKISTAN BUILDING CODE shall be followed.” The next clause, 4.1.18, does the same for the 2016 Fire Safety Provisions, explained for shops and offices in our guide to fire safety for commercial fit-outs. The structural drawings go in with the house plan, as set out in our guide to CDA building plan approval for a house.
  3. In Rawalpindi, we have not found an equivalent clause in a regulation we could read today. The PEC bye-law still binds the engineer who designs the house, wherever it stands.

The newer code is a separate question. PEC has published the Building Code of Pakistan 2021 (BCP 2021), based on the 2021 International Building Code. It replaces zones with mapped spectral accelerations at a 2% chance of exceedance in 50 years, and assigns buildings a Seismic Design Category. On PEC’s own site it is filed as a final draft dated 26 October 2021, and we have found no gazette notification of it. CDA’s clause names no edition. So the honest position is: the 2007 provisions are the notified edition, BCP 2021 exists, and your engineer should state on the structural drawings which one the design follows.

What Zone 2B changes in a concrete frame house

Most new houses in Islamabad and Rawalpindi have a reinforced concrete frame with brick infill. For these, Zone 2B sets three things.

A house is not exempt. Section 5.29.1 lets one and two family dwellings skip the earthquake design section only in Seismic Zone 1. A house is a “standard occupancy” structure (Occupancy Category 4, importance factor 1.0 in Table 5.10), and for buildings of not more than two storeys above the basement (in Islamabad, regulation 2.6 of the CDA rules decides what counts as a house basement) the code allows a simplified static method (section 5.29.8.2). Simplified does not mean skipped.

The frame must be at least intermediate. Under section 5.33.2.7, concrete frames that resist earthquake forces must be special moment-resisting frames in Zones 3 and 4, and “as a minimum, intermediate moment-resisting frames” in Zone 2. Chapter 7 (7.3.1.3) says the same for Zones 2A and 2B and allows structural walls instead. An intermediate frame is a detailing standard: how closely column and beam ties are spaced, how bars are lapped, how beams join columns. It shows on the structural drawings, and on site before concrete is poured.

Soil changes the force. The design force depends on the zone and on the ground. With Z = 0.20, the code’s seismic coefficients are:

Soil profile (Table 4.1) What it is Ca (Table 5.16) Cv (Table 5.17)
SA Hard rock 0.16 0.16
SB Rock 0.20 0.20
SC Very dense soil and soft rock 0.24 0.32
SD Stiff soil 0.28 0.40
SE Soft soil 0.34 0.64

On soft soil the longer-period coefficient Cv is four times the hard rock value. Where the soil is not known in enough detail, section 5.29.3 tells the engineer to assume SD, unless SE is suspected or found. Filled plots, old nullah beds and made ground on the edges of the twin cities are where that assumption is most likely to be wrong, and where a soil investigation earns its cost.

Load-bearing brick houses: Category C

Some houses, boundary structures and outbuildings are still built with brick walls carrying the roof. Chapter 9 of the code puts these in a building category by zone and importance (Table 9.25). A house (importance 1.0) is Category C in Zone 2B and Category D in Zone 3. The main Category C rules:

Rule Category C (Zone 2B house) Category D (Zone 3 house, e.g. Murree)
Mortar (Table 9.26) Cement-sand 1:6, or cement-lime-sand 1:2:9, or richer Cement-sand 1:4, or cement-lime-sand 1:1:6, or richer
Nearest opening to an inside corner (Table 9.27) At least 230 mm At least 450 mm
Total opening width as a share of wall length 0.55 one storey, 0.46 two storeys, 0.37 three or four 0.50, 0.42, 0.33
Pier between two openings At least 450 mm At least 560 mm
Vertical steel at corners (Table 9.30) None for one or two storeys; 10 to 12 mm bars for three 10 mm from one storey; 10 and 12 mm for two
Steel in a 5 m band (Table 9.29) 2 bars of 8 mm 2 bars of 8 mm

Bands are continuous reinforced concrete strips through the walls: at plinth where the soil is soft or uneven, at lintel level, and under the roof. They are the full wall width, at least 75 mm deep, in M15 (1:2:4) concrete, with longer spans needing heavier bars (Table 9.29). Table 9.28 lists the strengthening for Category C of one or two storeys as “a, c, c, f, g”, an evident misprint in which the lintel band (b) or roof band (c) is doubled; we read it as requiring both and would specify both. Bearing-wall buildings are limited to four storeys or 15 m (9.9.17.5.1), bricks must crush at not less than 3.5 MPa (9.9.17.3), and arches over openings are to be avoided (9.9.17.7.6).

Building in the hills around the twin cities

Murree, Kotli Sattian and Abbottabad are Zone 3, and the code’s site chapter matters more there. Before placing a building on or beside sloping ground in hilly terrain, the slope’s stability must be examined, and the building’s position must meet the setbacks in Figure 3.1 unless special slope measures are taken (section 3.4). In Zones 3 and 4 the foundation rules of section 4.5 also apply, and concrete frames must be special moment-resisting frames.

That examination starts with a plan of the ground: levels, the slope above and below the plot, cuts, retaining walls and drainage. Our topographic survey gives the engineer exactly that, in the same coordinates the engineering survey later uses to set the building out.

What to ask your engineer and builder

A house in Zone 2B is only as safe as its drawings and the work that follows them. Before you sign with a builder, ask for these, in writing, and attach them to the construction contract:

  1. The zone and code edition on the structural drawings: “BCP SP-2007, Zone 2B, Z = 0.20”, or the BCP 2021 parameters if that edition is used.
  2. The soil profile assumed, and whether it came from a soil investigation or the code’s default SD.
  3. The frame type: intermediate or special moment-resisting, with the tie spacing and lap details drawn, not left to the site.
  4. For bearing walls: the mortar mix, band positions and bar sizes from Tables 9.26 to 9.30.
  5. Inspection before every pour, so ties, laps and cover are checked while they can still be seen. Our house construction supervision checklist lists what to check at each stage.

Our construction team builds to the structural drawings, with setting out and levels checked by our own surveyors and each stage inspected before it is covered. The house itself starts with architecture that keeps the plan regular and the openings within limits, and owners who build with another contractor can add project supervision for those pre-pour checks. When the house is finished, as-built drawings record what was actually built, which is what any future engineer will need. To discuss a plot in Islamabad, Rawalpindi or the hills, send its location and size through our contact page, or book a short consultancy visit if you need a second opinion on drawings you already have.

Want RN Tech Associates to handle this for your site?

Send the location and what the work is for. We reply with the questions that decide scope and price.

Questions

Common questions

01Is Islamabad in seismic zone 3 or 2B?

Zone 2B. Table 2.2 of the Building Code of Pakistan, Seismic Provisions 2007, lists Islamabad (Federal Area) as 2B, and so is Rawalpindi tehsil. Older news reports and research papers mention zone 3 or higher site hazard values, but those are pre-code zoning or research estimates, not the zone the code assigns for design.

02What is the seismic zone of Murree?

Zone 3, as is Kotli Sattian. Both are tehsils of Rawalpindi district, so a house in Murree is designed for 0.24g to 0.32g, needs special moment-resisting frames if it has a concrete frame, and falls in masonry Category D if it has bearing brick walls.

03Does a 5 or 10 marla house have to follow the Building Code of Pakistan?

Yes, in Zone 2B. Section 5.29.1 exempts one and two family dwellings only in Seismic Zone 1. In Islamabad, CDA's Building Control Regulations add clause 4.1.17: provisions of the Pakistan Building Code shall be followed for safety against earthquakes.

04Do I need a soil test for a house in Islamabad or Rawalpindi?

The code assigns each site a soil profile from geotechnical data. Where soil is not known in enough detail, it tells the engineer to assume Soil Profile SD, a stiff soil, unless softer soil is suspected. A soil test replaces that assumption with measured data, and on soft or filled ground it can change the design forces considerably.

05Has the 2007 seismic code been replaced by BCP 2021?

PEC has published the Building Code of Pakistan 2021, based on the 2021 International Building Code; its own site carries it as a final draft dated 26 October 2021. We have not found a gazette notification for it. The 2007 Seismic Provisions remain the edition notified in 2008, so ask your engineer to state on the drawings which edition the design follows.

06Is my existing house earthquake safe?

The zone cannot tell you that. An existing house needs an engineer's assessment of what was actually built. BCP 2021 includes guidelines for seismic evaluation and retrofit of existing buildings, based on ASCE/SEI 41-17, and the assessment starts from accurate drawings of the building as it stands.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.