Scheme development
From bare land to an approved, demarcated scheme
Most firms do one step and pass you on. We can take a housing scheme through every stage, or join at the one you need, with the same coordinates from the first survey point to the last plot corner.
Six stages
What happens, in order
Each stage produces something the next one stands on. Follow the links for the detail of each.
- 01
Land check
Before money is spent on plans: where the land sits in the master plan, which authority and rules apply, access road width, flood risk, and whether the title documents will satisfy the authority.
- 02
Topographic survey
The land and the margin around it surveyed to the authority’s specification: in Punjab’s development-authority areas, 1,000 ft around the scheme; in Islamabad, a survey plan with 0.5 m contours.
- 03
Layout plan
Roads, plots, open space, graveyard, public buildings and commercial areas planned on the survey and the khasra plan, with the area statement checked against the planning standards.
- 04
Approval file
Documents, drawings and reports assembled for the development authority, submitted by the sponsor, and followed up through comments and revisions.
- 05
Demarcation
The approved layout set out on the ground from the survey control: road centrelines, block corners and plot corners, marked so they can be found again.
- 06
Infrastructure and buildings
Roads, drains and services built and supervised; model houses and community buildings designed and built; as-built records kept for completion.
Stages 02 → 03
The plan is drawn on the survey
Drag the line to compare the measured ground with the scheme planned on it.
Questions
Scheme development
01Can you take a housing scheme from bare land to development?
Yes. We can check the land, survey it, plan the layout, prepare the approval file, demarcate the approved plan on the ground, and design, supervise and build the infrastructure and buildings.
02Can we hire you for only one stage?
Yes. Many clients come to us for the survey or the layout plan alone. Each stage stands on its own; it is simply easier when the earlier stages were done to the same coordinates.
03What do we need before starting?
The land’s location and khasra numbers, the title documents, and a rough idea of the scheme you want. We can advise on anything missing.
04How long does the whole process take?
Survey and planning take weeks to a few months, depending on size. Authority approval often takes much longer, commonly a year or more, and is outside anyone’s control except by submitting a complete, correct file.
05Why does using one team matter?
Because each stage builds on the last. When the survey, layout, approval drawings and demarcation share the same control and coordinates, nothing has to be re-measured or re-drawn to make it fit.
→Request a survey
Tell us about the land
Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.
- WhatsApp0333 5678592
- Call0333 5678592
- Emailinfo@rntechassociates.com
Enquiry sent
Thank you. Your enquiry has been sent.
Your reference
A confirmation is on its way to your email. If you do not see it in a few minutes, please check your Spam folder.
We will reply by email or WhatsApp with the questions that decide the scope and the price.