Scheme development

From bare land to an approved, demarcated scheme

Most firms do one step and pass you on. We can take a housing scheme through every stage, or join at the one you need, with the same coordinates from the first survey point to the last plot corner.

Six stages

What happens, in order

Each stage produces something the next one stands on. Follow the links for the detail of each.

  1. 01

    Land check

    Before money is spent on plans: where the land sits in the master plan, which authority and rules apply, access road width, flood risk, and whether the title documents will satisfy the authority.

    OutputFeasibility noteDetails
  2. 02

    Topographic survey

    The land and the margin around it surveyed to the authority’s specification: in Punjab’s development-authority areas, 1,000 ft around the scheme; in Islamabad, a survey plan with 0.5 m contours.

    OutputSurvey plan, DWG, coordinatesDetails
  3. 03

    Layout plan

    Roads, plots, open space, graveyard, public buildings and commercial areas planned on the survey and the khasra plan, with the area statement checked against the planning standards.

    OutputLayout plan, area statementDetails
  4. 04

    Approval file

    Documents, drawings and reports assembled for the development authority, submitted by the sponsor, and followed up through comments and revisions.

    OutputSubmission set, revisionsDetails
  5. 05

    Demarcation

    The approved layout set out on the ground from the survey control: road centrelines, block corners and plot corners, marked so they can be found again.

    OutputMarked corners, setting-out recordsDetails
  6. 06

    Infrastructure and buildings

    Roads, drains and services built and supervised; model houses and community buildings designed and built; as-built records kept for completion.

    OutputSupervision reports, as-built drawingsDetails

Stages 02 → 03

The plan is drawn on the survey

Drag the line to compare the measured ground with the scheme planned on it.

Illustrative topographic survey sheet: contours, spot levels and site boundary508.00522.30513.60527.90518.20509.50523.80514.10528.40519.70510.00524.30515.60529.90520.20511.50525.80516.10N0100 mTopographic survey
Illustrative housing scheme layout plan: roads, plots and open space over the same siteOPEN SPACEMOSQUE / COMMUNITYN0100 mApproved layout plan
Illustrative drawings, not a client project.

Questions

Scheme development

01Can you take a housing scheme from bare land to development?

Yes. We can check the land, survey it, plan the layout, prepare the approval file, demarcate the approved plan on the ground, and design, supervise and build the infrastructure and buildings.

02Can we hire you for only one stage?

Yes. Many clients come to us for the survey or the layout plan alone. Each stage stands on its own; it is simply easier when the earlier stages were done to the same coordinates.

03What do we need before starting?

The land’s location and khasra numbers, the title documents, and a rough idea of the scheme you want. We can advise on anything missing.

04How long does the whole process take?

Survey and planning take weeks to a few months, depending on size. Authority approval often takes much longer, commonly a year or more, and is outside anyone’s control except by submitting a complete, correct file.

05Why does using one team matter?

Because each stage builds on the last. When the survey, layout, approval drawings and demarcation share the same control and coordinates, nothing has to be re-measured or re-drawn to make it fit.

→Request a survey

Tell us about the land

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.