Why records are not enough
Under most streets in Pakistani cities run water mains, sewers, gas lines, power and telecom cables, laid by different agencies over decades. Records are often missing, out of date or drawn on old base maps. A digger working from records alone is guessing (see what to do before you dig), and a struck gas line or fibre cable costs far more than a survey.
Certainty, stated honestly
The most useful thing a utility survey can tell you is how sure it is about each line. The ASCE 38-22 standard gives four quality levels for that:
- QL-D: from records and verbal accounts only.
- QL-C: records plus surveyed visible features such as manholes and valves.
- QL-B: the line detected and traced on the ground with geophysical methods.
- QL-A: the line exposed in a trial hole and its position and depth measured directly.
Our utility plans record the level of every line segment. A designer can then decide where a trial hole is worth digging, instead of trusting or distrusting the whole drawing. The accuracy each level carries under PAS 128, and how to write the levels into a tender, are in our guide to utility survey quality levels and what to specify.
Detection methods
Electromagnetic locators trace metallic pipes and cables, either by picking up the signal they already carry or by applying a signal to them. Ground penetrating radar sends radar pulses into the ground and records reflections from pipes, cables and voids, including non-metallic pipes. Each has limits (soil type, depth, congestion), so we use them together and say where neither could see; what each instrument finds and misses is set out in our comparison.
When you need one
Order a survey before the ground is opened or a design is fixed: foundations and basements, trenches for new sewer, water or gas lines, road widening, and boreholes or test pits for a soil report. In old streets with thin records it is worth doing before the design starts, so the engineer routes around what is there instead of discovering it with a bucket.
What can stop a line being found
No instrument finds everything. Ground penetrating radar loses reach in wet or dense soil, and it cannot see beneath heavy reinforcement. Locators miss plastic pipes and directly laid fibre, and crowded networks distort their readings. Very deep sewers and house connections may be out of reach or outside the brief. We say so on the plan, so an empty patch is never mistaken for a clear one. The full list, and what to write into a brief, is in our guide to utility survey quality levels.
Using the utility plan
The utility plan is drawn in the same coordinates as our topographic survey, so it can sit on one drawing with levels and features. Designers use it to route new services; contractors use it before the setting out and excavation of trenches and foundations. On our own construction work, services laid by us are recorded in the as-built survey before they are covered, in the way our guide to recording utilities as they are laid describes. For a decision on what level of certainty a project needs, our consultancy can advise. How we record certainty is explained on our standards page. All five surveys are listed under our land surveying services.