What an underground utility survey is, and when you need one
An underground utility survey finds and maps the water, sewer, gas, power and telecom lines buried under a site before anyone digs or designs. It combines records, surface features, instruments that detect what is below, and sometimes a trial hole. The result is a plan of where each service runs and how sure the surveyor is about it, which is what the quality levels below describe.
You need one when the ground will be opened or a design depends on what is under it:
- Before excavation: foundations, basements, trenches, road widening, boreholes and test pits.
- Before design: engineers routing a new sewer, water main or cable around existing lines.
- In old, dense streets: where records are thin and several services share a narrow lane.
- When a specification asks for it: some funded projects ask for utility information at a stated quality level.
Most surveys use two detection methods together, because each covers the other’s blind spot. An electromagnetic locator traces metal pipes and cables, but only those that carry or accept a signal. Ground penetrating radar sees plastic, concrete and clay pipes as well, but its reach drops in wet or dense soil. Neither is a guarantee, so a good survey also says where it could not see. Both methods, their limits and a grid for each area are covered further down.
The four levels, in one table
Utility survey quality levels grade every buried line on a drawing by how it was found. The scale runs from D, the least certain, to A, the most. Both international standards use the same four letters. The US standard is ASCE 38-22, published by the American Society of Civil Engineers in July 2022 to replace ASCE 38-02. The UK one is PAS 128:2022, published by BSI on 30 April 2022 to replace the 2014 edition.
| Level | How the line was found | What you can rely on | Depth? |
|---|---|---|---|
| QL-D | Utility records, old drawings, what people remember | That a service probably runs somewhere near | Only if the record shows one |
| QL-C | Records matched on site to visible covers, valves, chambers, marker posts and trench scars | The route between surveyed surface features, as a best fit | Only if the record shows one |
| QL-B | Detected from the surface with electromagnetic locators and ground penetrating radar (GPR), then surveyed | The line’s position on the ground; under PAS 128, also an estimated depth when the reading is good enough | Estimated, within a stated margin (PAS 128) |
| QL-A | Exposed in a trial hole or seen inside a chamber, then measured | Position and depth at that point | Measured |
The US Federal Highway Administration (FHWA), which promotes the levels on highway projects, sums up the economics: QL-D is “useful primarily for project planning and route selection”, and the highest level “is generally not needed at every point”. The skill is in deciding where each level is worth its cost.
ASCE 38-22 and PAS 128:2022: one ladder, two levels of detail
The two standards agree on the ladder but not on how finely they grade it. ASCE 38-22 keeps four levels. Its QL-B, as FHWA puts it, determines “the existence and horizontal position” of utilities. In other words, a position across the ground, with no promised depth.
PAS 128 splits detection into four grades and gives each a tolerance. The figures below are from Table 1 of PAS 128:2022, as reproduced with BSI’s permission in The Survey Association’s client guide (Issue 3, May 2025). Horizontal is measured to the centreline of the utility, vertical to its top.
| PAS 128 level | Survey type | Horizontal | Vertical | Meaning |
|---|---|---|---|---|
| QL-D | D: desktop records search | Not defined | Not defined | Copy of the owner’s record only |
| QL-C | C: site reconnaissance | Not defined | Not defined | Record matched to street furniture or reinstatement scars |
| QL-B4 | B: detection | Not defined | Not defined | Suspected from records but not detected: an assumed route |
| QL-B3 | B: detection | ±500 mm | Not defined | Located across the ground, but no reliable depth |
| QL-B2 | B: detection | ±250 mm | ±40% of detected depth | Position and depth found with confidence |
| QL-B1 | B: detection | ±150 mm | ±15% of detected depth | Position and depth found with high confidence |
| QL-A | A: verification | ±50 mm | ±50 mm | Exposed or seen in a chamber and measured |
A “P” after a B level (QL-B1P, for example) means the radar data was post-processed in the office, which generally adds confidence. Two notes in the table matter on site. A line found by the locator alone and not confirmed by radar is QL-B3. And a Type B survey must use at least radar and an electromagnetic locator, not one of them.
What the depth margins mean in practice: a pipe detected at 1.5 m depth is somewhere between about 0.9 m and 2.1 m at QL-B2, and between about 1.28 m and 1.73 m at QL-B1. That is fine for routing a design. It is not fine for a bucket working beside a gas main, which is why trial holes exist.
Why you cannot order a “QL-B survey”
This is the most common mistake in a utility survey brief, in Pakistan and elsewhere. A tender asks for “a QL-B utility survey” or “all services to QL-A”, as if a level were a product. It is not. A level is assigned to each segment of each line after the survey, according to what the methods actually achieved on that segment.
The Survey Association’s guide puts it plainly: “there is no such thing as a Quality Level B1 survey that can guarantee all utilities detected can be found with a defined level of confidence.” Ground, depth, pipe material and congestion decide what is achievable, and they vary metre by metre.
What a client can order is:
- A survey type for each area: records (D), site reconnaissance (C), detection (B) or verification (A).
- A search effort for detection areas: how closely the ground is scanned (PAS 128 calls these methods M1 to M4P, below).
- Verification at named points: trial holes where the design or the excavation meets a detected service.
The drawing then shows, segment by segment, which level was reached. A survey report that gives one level for the whole site, or none at all, is the warning sign.
How a surveyor decides between QL-B1, B2, B3 and B4
The level on a drawing is a judgement the surveyor makes for each segment, using the rules in Table 1 of PAS 128:2022. The Survey Association’s client guide spells out what those rules mean in the field. This is how to read them.
| Level | What the surveyor must have to give it | What it does not mean |
|---|---|---|
| QL-B4 | Nothing was detected. The line comes from records or is suspected, and is drawn as an assumed route | That the line is absent. It means the instruments did not find it |
| QL-B3 | Horizontal position only. A locator reading that radar did not confirm, or radar features (such as the sides of a trench or its fill) that point to a utility without identifying it, stay at B3 | That the depth on the drawing can be used |
| QL-B2 | Position and depth detected, with a symmetrical locator field whose peak and null readings fall inside the B2 tolerance, or radar data where both depth and position can be read to that accuracy | A guaranteed margin for the whole length of the line |
| QL-B1 | The same, to the tighter tolerance. If only one technique found the line, the surveyor should be ready to show the client clear evidence that the accuracy was reached | That every service on the site was found to this level |
Three rules in the standard change how a drawing should be read:
- A locator reading alone is B3. The guide says locations taken from the electromagnetic receiver alone and not confirmed by radar are classed as B3. A drawing full of B2 and B1 lines should therefore have radar behind it, not just a locator.
- A Type B survey replaces the earlier levels inside its area. Once detection has been tried in an area, every line there gets some B level, and records that could not be found are shown as B4. The old QL-C and QL-D labels are not kept in the surveyed area. QL-A points, such as an inspection chamber, may sit inside it.
- A record that does not match the site stays QL-D. If the owner’s plan does not agree with any feature seen on site and cannot be repositioned, it keeps the QL-D label.
A “P” after the level shows the radar data was post-processed in the office. Under the 2022 edition, post-processing is required for any survey on a 1 m or denser grid (so only M3P and M4P remain at that effort), and data from a multichannel radar array is always post-processed. The guide also says the best level on offer is not always reachable: ground, depth and congestion decide it, and the highest confidence “is not always possible”.
What to ask for when the drawing arrives
- A level on every segment, shown on the drawing or in the layer name. The client guide’s own example puts it in the layer name (a gas line detected to QL-B1 ends in “_B1”), so a printout can be checked against the file.
- A list of the lines that records show but the survey did not find. Each should be B4, not silently dropped.
- The evidence behind any B1. If one technique found it, ask what it was.
- A plan of where detection failed or was blocked, so you know where your design is still guessing.
For a QL-A point the guide names hand-dug trial holes and smaller vacuum excavations as the safest ways to confirm depth and position where there is no manhole or chamber. The client sets the number and place of holes from the conflicts the project has, and the surveyor can advise on where they are practical. Reinstatement can be a real part of the cost, particularly in a carriageway, and the surveyor must tell you early if a hole cannot be dug, so you can move it. All digging is done assuming utilities are present.
How detection works, and what it misses
Detection uses two instruments because each covers the other’s blind spot.
- Electromagnetic locators pick up metal pipes and cables, either from the signal they already carry or from a signal the surveyor applies. They miss plastic pipes and glass fibre, and dense networks, nearby steel and reinforced concrete distort their readings.
- Ground penetrating radar sends pulses into the ground and records the echoes, so it can see plastic pipes, ducts and trenches. Its reach depends on the ground: saturated or dense soil cuts it, and it cannot see beneath metal or heavy reinforcement.
PAS 128 sets the search effort by grid spacing:
| Method | Radar grid | Typical use (PAS 128, informative) |
|---|---|---|
| M1 / M1P | 5 m or closer | Few services, as in an undeveloped area |
| M2 / M2P | 2 m or closer | Suburban density, or where services cross the survey boundary |
| M3P | 1 m or closer, post-processed | Busy urban areas, and clearance before boreholes, drilling, fencing or tree planting |
| M4P | 0.5 m or closer, post-processed | Congested city areas |
Some things no grid fixes. The Survey Association notes that small plastic gas and water pipes and directly laid fibre cables are hard to detect, and that “small diameter fibre optic cables laid directly into the ground are unlikely to be detectable”. Very deep sewers may be beyond both instruments. Service connections to individual houses are also hard to find and are often outside the scope unless the brief includes them. In Pakistani cities, where old metal and newer plastic lines share narrow lanes, this is why we combine methods and say on the drawing where neither could see.
What to specify for common Pakistani projects
There is no local standard to copy from, so here is how we would scope the usual jobs. Treat it as a starting brief; the survey itself may show that one area needs more.
| Project | Whole site | Where you will dig or design | Verify (QL-A) |
|---|---|---|---|
| Feasibility of farmland for a housing scheme | Records and site reconnaissance (D + C) | Detection along the access road and wherever a record or marker post shows a main | Only if the layout crosses a detected main |
| Boreholes and test pits for the scheme’s soil report | Records (D) | Clearance detection at each point, at a close grid (PAS 128 lists M3P for borehole clearance) | Hand-dug start where a line is detected close by |
| Road widening, flyover or drain in an existing city road (the route survey supplies the centreline and sections) | D + C over the corridor | Detection at a close grid (M3P, or M4P where congested) | At every crossing or close approach of the new work to a detected main |
| New sewer, water or gas line through an existing settlement | D + C | Detection along the route | At each crossing, to measure depths the design needs |
| Building with a basement in a built-up street | D + C | Detection over the plot and the street frontage | Where the excavation line meets a detected service |
| Fibre or cable in a footpath | D + C, with the telecom operators’ records | Detection along the route | Where records show existing fibre the instruments cannot confirm |
The soil report is not optional for a scheme: the documents a housing scheme file needs, including the boreholes and test pits some authorities ask for, are set out in our housing scheme approval documents checklist. Each borehole is a point where a drill meets the ground blind, so a short clearance survey there is cheap insurance.
Where QL-D comes from in Pakistan
Records in Pakistan are scattered across many owners, and there is no single office that collects them, so whoever digs has to ask each one. For a site in Rawalpindi or Islamabad, the usual owners are WASA (water and sewerage in Rawalpindi), CDA (services in Islamabad’s planned sectors), SNGPL (gas), IESCO (electricity), PTCL and the other telecom operators, the cantonment boards in cantonment areas, and the management of any private scheme for the services inside it. In Lahore the names change (WASA Lahore, LESCO), but the pattern is the same.
Three cautions apply. Records are often drawn on old base maps, so even a correct line can sit in the wrong place on the drawing. Services laid by contractors on behalf of a scheme may never have reached any owner’s records, unless someone recorded them as they were laid. And a neat CAD compilation of records is still QL-D: the quality level belongs to how the information was found, not how well it was drafted.
Wording for a tender or brief
A brief that answers these points gets comparable quotes and a drawing you can use, as a written scope does for the rest of an engineering survey. Copy what fits:
- Survey area on a plan, divided into sub-areas, with the survey type for each (D, C, B or A).
- Standard: “Quality levels to ASCE 38-22” or “to PAS 128:2022”, named, so every level means one thing.
- Detection: electromagnetic locator and ground penetrating radar together; the grid or PAS 128 method for each area, or a request for the surveyor to propose one.
- Per segment: utility type, quality level, the method that found it, and the date of any record used.
- Depth: where depths are needed, and how each was obtained (estimated from detection or measured in a trial hole).
- Covers: whether manholes and chambers are to be lifted and inspected. It is not automatic.
- House connections: in or out of scope.
- Trial holes: how many, or the rule for placing them (“at each crossing of the proposed drain with a detected service”), and who obtains permission and reinstates.
- Coordinates and formats: the same coordinate system as the topographic survey, and the CAD and PDF files required.
- Report and meeting: areas not surveyed, utilities expected but not found, conflicts with records, recommendations for further work, and a meeting to go through it.
What the deliverable must contain
PAS 128 sets out what a detection survey report should hold, and it is a useful checklist whichever standard you name. Expect the survey area and requirements, the methods used, ground and weather conditions, how deep the radar could see in different parts of the site, and for each segment its utility type, quality level and method. Then come the parts that make the survey honest: a plan of areas where detection failed, a list of services that records show but the instruments did not find, other buried obstructions, and conflicts between records and detections. A verification survey adds a cross-section of each trial hole showing every exposed service.
Our own underground utility survey delivers this as a utility plan in DWG and PDF, one layer per service type, with the quality level of every segment, depths and how they were measured, trial hole records with photographs, and a report of the records used and the areas not surveyed. The plan is drawn in the same coordinates as our topographic survey, so services, levels and features sit on one drawing. It is then used to set out trenches and foundations in the engineering survey, and services we lay ourselves are picked up in the as-built survey before they are covered. How we record certainty is also summarised on our standards page.
If you are writing a tender and want a second opinion on the brief, our consultancy can review it. To scope a survey, send the site location, a plan of where you will dig or design, and any records you already hold through our contact page. We will reply with the survey type for each area and the questions that set the price.