Town Planning

Master planning

Master planning sets out how a large area will develop over time: where homes, commerce, public buildings and open space go, how roads and utilities connect them, and in what order the land is developed. It is broader than a single scheme's layout plan and comes first; each phase is later detailed in its own layout. We base master plans on surveyed ground and the area's existing zoning.

Published · RN Tech Associates surveying and planning team

Close view of a large physical scale model of housing, roads and open land

Key facts

Scale
Towns, large schemes, campuses, mixed-use developments
Sets
Land use, road hierarchy, utilities corridors, phasing, open space network
Based on
Topographic survey, existing zoning and master plans, site constraints
Followed by
Detailed layout plans for each phase
Delivered as
Master plan drawings, land-use budget, phasing plan, report

Structure before detail

A master plan answers the big questions before anyone draws a plot: where the main roads run, where water drains, which land is best for homes and which for commerce, where the schools, mosques and parks go, and in what order it all gets built. Getting those right is cheap on paper and very expensive to fix once the first phase is sold.

Planned on surveyed ground

We start every master plan from the topographic survey and a drainage analysis. Main roads that follow the contours are cheaper to build and easier to drain; open space placed along natural drainage lines doubles as flood protection. The area’s existing master plan and zoning set the limits we plan within; how to read your land’s status and what conversion costs is in a separate guide.

Land-use budget and road hierarchy

The first working table of a master plan is the land-use budget: every use as an area and a share of the site. Where the master plan will be detailed into private housing schemes, the budget starts from the shares the rules fix. Under rule 10 of the Punjab Private Housing Schemes Rules 2022, a scheme of 100 kanal or more keeps at least 7% for open space and 2% for a graveyard, and commercial is a cap of 5%, 7% or 10% by size band. Inside a development authority’s area, rule 10 of the 2021 rules has its own table, with a major road of 80 feet up to 300 kanal and wider above. Both tables are set out side by side in our guide to housing scheme planning standards in Punjab.

The budget and the road hierarchy are drawn together. A master plan fixes the major roads that carry traffic between phases and out to the wider network, and the collector and local streets are left to each phase’s layout plan. Roads proposed in an approved master plan must be kept by later schemes, so a corridor reserved now stays open when the neighbouring land is developed; in Rawalpindi, the proposed roads are on RDA’s draft peri-urban plans.

Utility corridors and open space

Water, sewerage, drainage and power are planned as corridors, not afterthoughts. Sewers and storm drains follow the fall of the land, so the survey decides where the outfalls go, and sites for tube wells, reservoirs and pumping stations are set aside while land is still unsold. Open space is placed along natural drainage lines where it can, so the same land serves as park and as flood relief. Before any digging is planned, an underground utility survey shows what is already buried on the site.

Phasing

Large sites are developed over years. A good phasing plan lets each phase stand on its own, with access, water and drainage, while keeping the land for later phases usable. Each phase is then detailed as a layout plan for approval, by one of the routes in our guide to phasing a large housing scheme. Under the 2021 Punjab rules, a later scheme by the same sponsor may carry the first scheme’s name with “Phase-II” or “Extension” added (rule 6(3)); the stages each application passes through are in our guide to private housing scheme approval in Punjab.

From master plan to built phases

A master plan starts from a topographic survey of the whole site. Each phase is then detailed as a housing scheme layout plan and taken through approval. For institutional and mixed-use sites, the plan sets the frame for the architecture of individual buildings. Where a client first needs to know whether a site can carry a scheme at all, we start with consultancy. The stages from bare land to built scheme are on our scheme development page. The full range is under our town planning services. More on our team and approach is on the about page.

How it works

How the work runs

  1. 01

    Brief and context

    Goals, programme and the area's existing zoning and plans.

  2. 02

    Site analysis

    Survey, drainage, access and constraints mapped.

  3. 03

    Options

    Two or three structure options compared on cost, phasing and fit.

  4. 04

    Master plan

    Preferred option developed into land use, roads, utilities and phasing.

  5. 05

    Phase layouts

    The first phase detailed as a layout plan for approval.

When you need it

Who asks for this, and why

  • Large private developments

    Schemes developed in phases over several years.

  • Institutional campuses

    Universities, hospitals and industrial estates planning growth.

  • Mixed-use projects

    Residential, commercial and public uses on one site.

  • Public and funded projects

    Planning input for towns and settlements under development programmes.

Questions

Master planning: common questions

01What is the difference between a master plan and a layout plan?

A master plan sets the overall structure of a large area: land uses, main roads, utilities and phasing. A layout plan details one scheme or phase down to individual plots, ready for approval.

02Do I need a master plan for a single housing scheme?

Not usually. A single scheme needs a layout plan. A master plan earns its place when a site will be developed in phases or mixes several uses.

03How is phasing decided?

By access, utilities and sales. Early phases sit where roads and services can reach cheaply, and each phase works on its own while later phases are built.

04Does the master plan follow the authority's zoning?

It must. We start from the area's existing master plan and zoning, and plan within them.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.