Why record what was built
Drawings show what was meant to be built. On almost every project, something changes on site: a drain moved round a rock, a wall shifted to suit a boundary, a level raised for drainage. An as-built survey records the real result, so the next person to work on the site, whether the owner, an authority, a designer adding an extension or a utility crew, starts from fact.
Stages, not just the end
The best time to survey buried work is before it is buried. Drains, water and gas lines and cable ducts should be surveyed while the trench is open; afterwards their position becomes a matter of records and detection. For schemes and large buildings, we plan as-built surveys at stages alongside construction, so the works the agencies inspect before mortgaged plots are released are on record. In Lahore, the same survey checks each plot’s sides and area before its record goes into PLRA’s HSMS, as our guide to the Lahore Property Certificate and HSMS explains.
Comparing with the design
An as-built survey is also the first step when a house in Islamabad was built without approval or against its plan: the measured differences decide what CDA can compound or regularise and what it orders demolished. Because we survey in the same coordinates as the design and the setting out, the as-built drawing can be laid directly over the design. Every difference is measured and listed, which turns “it looks right” into a record that can be signed off. Checks against a design tolerance are total station work; a drone flight can record finished earthworks and roads across a large site, but it cannot see under roofs or measure to the millimetre.
Part of one measured record
An as-built survey closes a chain that starts with the topographic survey and continues through the engineering survey and setting out of the works. It is the natural end point of project supervision and of the construction we carry out ourselves. Services surveyed before backfilling can also be added to an underground utility survey of the area, with their quality level stated (measured in an open trench, they count as QL-A in ASCE 38-22, the US standard for documenting existing utilities, an approach the US Federal Highway Administration also describes, as our guide to utility survey quality levels explains). Our checking method is set out on the standards page. All five surveys are listed under our land surveying services.