Short answer

An as-built drawing records what was actually built, with every change from the approved design shown. Record drawings are the clean final set compiled from those marked-up as-builts. For a building with no drawings at all, a measured survey recreates them. In Islamabad, CDA's building regulations call them completion drawings and check the house against them before a completion certificate is issued.

As-built drawings: what they record, how they differ from record drawings, and how to get them for an existing building

Key points

  • As-built drawings are the marked-up record of what changed on site; record drawings are the final set compiled from them.
  • A measured survey is how you get drawings of a building that has none: it records what stands, not what was meant.
  • CDA's regulations call them "Completion Drawings (As Built Drawings)": six sets, signed by the architect, filed with Form B-2.
  • In Islamabad, more than 15% change from the approved plan, or a main structural change, doubles the scrutiny fee.
  • RDA's completion checklist asks for a completion plan stamped by an RDA-registered architect and structural engineer.

What an as-built drawing is

An as-built drawing shows a building or site as it was actually built, not as it was designed. Almost every job changes on site: a column moves to clear a drain, a window grows, a stair turns the other way, a sewer line takes a different route to the street. The design drawings still show the original idea. The as-built drawing shows the result, with each change marked.

The clearest published definition we found is in the US federal closeout specification, UFGS 01 78 00 (August 2026 edition), used on American military construction. It says as-built drawings “are the marked-up drawings, maintained by the Contractor on-site, that depict actual conditions and deviations from the Contract Documents.” The point is in two words: maintained, because the record is kept up as the work goes on, and deviations, because the value lies in what changed.

So an as-built drawing is not a new design and not a sales plan. It answers one question: where is everything, really? That matters to the owner who extends the house later, to the electrician who needs to know where a conduit runs, to a buyer’s surveyor, and in Islamabad and Rawalpindi to the authority that issues the completion certificate.

As-built, record and measured drawings

Three kinds of drawing get called “as-built”, and they are not the same thing. An insurer’s note for design professionals puts it bluntly: “there is no set definition for these terms”, and the confusion leads to disappointed owners and disputes. Agree in writing which one you are paying for.

As-built (marked-up) drawings Record drawings Measured drawings
What it is The design drawings, marked up during construction with every change The clean final set, compiled from the marked-up as-builts A new drawing made by measuring an existing building
Made by The builder, as work proceeds The architect, engineer or a drafter, at the end A surveyor or architect, at any time
Starts from The approved design The as-builts and approved changes Nothing but the building itself
Shows changes from design? Yes, by colour and notes Yes, built into the drawings Only if compared with a design afterwards
When you need it During the job, and as input to record drawings At hand-over, for the file and future work When there are no drawings, or they cannot be trusted
Weak point Only as good as the builder’s discipline Only as good as the markups it was built from Cannot see inside walls, under floors or below ground

UFGS 01 78 00 defines the second column too: “The record drawings are the final compilation of actual conditions reflected in the as-built drawings.” In Pakistan, most owners meet the third column first. Many older houses have no drawings at all, or a faded approved plan that no longer matches what stands. For them, a measured survey is the only honest route to an as-built set.

What as-built drawings should show

A useful as-built set shows anything that is hard to find later, measured, not guessed. UFGS 01 78 00 lists what American federal jobs must record, and most of it carries straight over to a house or a scheme in Pakistan. The table below adapts that list, and adds the items CDA’s inspector checks at completion under regulation 5.6.8 of the Islamabad building regulations.

Item What to record Why it matters later
Plot lines and setbacks Building outline measured from the plot corners; front, side and rear setbacks Setbacks are checked at completion (CDA 5.6.8) and by a buyer’s surveyor
Levels Plinth level against the average front road level; ramp height at the gate; floor levels CDA checks maximum plinth level and ramp height (5.6.8)
Covered area Each floor’s covered area, from measured outlines Total covered area is checked at completion (5.6.8)
Structure Changes to columns, beams, walls and slabs, with sizes A main structural change doubles CDA’s scrutiny fee (4.1.4)
Openings and stairs Doors, windows, stair position and direction, as built Layout changes are the most common difference from the approved plan
Buried services Sewer, storm drain, water and gas runs: route, sizes, depth, and offsets from two fixed features at each end and each bend UFGS 3.1.2 asks for exactly this, so a line can be found after it is covered
Drainage Invert levels, falls, manholes, the gate grating and the connection points CDA checks the sewer and storm drain connections and the gate grating (5.6.8)
Tanks Underground and overhead tanks, sizes and positions Rainwater harvesting tanks are checked where they apply (5.6.8)
Selected options Only the option actually built, where the design offered choices Prevents two versions living on one sheet (UFGS 3.1.2)

UFGS also sets a simple marking rule that works on any job: red for what was deleted, green for what was added, blue for special notes, and written explanations beside the marks, not graphics alone. Its other rule is just as practical: “show what was changed, how it was changed, where item(s) were relocated.” Buried services deserve special care. Once a trench is backfilled, a line drawn from memory is a guess; measured while open, it is a fact, which is why our guide to utility survey quality levels treats a line measured in an open trench as the highest level of certainty.

Completion drawings in Islamabad and Rawalpindi

In Islamabad, as-built drawings are a legal filing, not a courtesy. The Islamabad Residential Sectors Zoning (Building Control) Regulations 2020 (S.R.O. 1575(I)/2019), as amended in August 2023 by S.R.O. 1074(I)/2023, use the phrase “Completion Drawings (As Built Drawings)”. Regulation 5.6.2 says Form B-2, “along with Completion Drawings (As Built Drawings) shall be signed by the Architect” and filed at CDA’s One Window Operation. Regulation 5.6.3 asks for six sets. Regulation 5.6.8 then says “Actual construction shall be verified according to the completion plan (As Built Drawings).”

That last line is the reason accuracy matters. The inspector does not check your house against the approved plan alone; he checks it against the drawings you file. A set that copies the approved plan while the house differs will fail on site. A true set that shows differences lets the case be dealt with openly: regulation 3.11.1(iii) and regulation 4.1.4 say that if the completion plan changes more than 15% from the approved plan, or there are main structural changes, double the scrutiny fee is charged on top of the normal completion fee.

Rawalpindi works the same way under a different name. RDA’s checklist for approval of a completion plan (its Urdu checklist, updated on RDA’s downloads page in February 2026) asks for the approved plan and approval letter, a completion plan in four ammonia prints and two cloth prints stamped by an RDA-registered architect and structural engineer, the BR-08 and BR-15 forms (BR-09 for multi-storey buildings) and a completion certificate from an RDA-registered structural engineer. It lists a processing fee of Rs 5,000 for a residential completion plan and Rs 10,000 for a commercial one. Our guide to RDA building plan approval goes through the nine items one by one.

The drawings are only one part of the completion file. The stage inspections, forms and fines that lead up to it are covered in our guide to the CDA completion certificate for a house in Islamabad; this guide stays with the drawings.

How to get as-built drawings for an existing building

There are three routes, and the right one depends on what already exists. Try them in this order.

  1. Ask the builder for the marked-up set. On a building finished recently, the contractor or supervising architect may hold drawings marked with the changes. Turning those into a clean record set is drafting work, but check a sample of dimensions on site first: markups are only as good as the discipline behind them.
  2. Get the approved plan from the file. If the building was ever approved, the plan exists with the authority or the housing society, and CDA’s regulations require a copy of the approved drawings to be kept on the property during construction (regulation 3.2.1). An approved plan is the design, not the building, so treat it as a starting point to be checked.
  3. Have the building measured. Where there is no file, or the file does not match what stands, a measured survey makes the as-built drawings from scratch.

A measured survey for a house or small building usually runs like this:

  1. Set control. A few fixed points around the plot, so every measurement ties into one frame. For a scheme or a large site we work on real coordinates (WGS-84 / UTM), so the drawing lines up with the plot plan and a satellite image.
  2. Fix the plot and the outline. Plot corners, boundary walls, the building outline at each floor, and setbacks from the plot lines, with a total station rather than tape alone.
  3. Measure inside. Room dimensions, wall thicknesses, door and window openings, stair positions, columns and beams where they show.
  4. Take levels. Front road level, plinth, ramp, each floor and the roof, so plinth height and storey heights can be stated.
  5. Record what is visible of the services. Manholes, inspection chambers, tanks, meter positions and invert levels where covers can be lifted. Hidden runs are marked as unknown, never drawn in as if seen.
  6. Draw and compare. Plans, elevations and sections in AutoCAD DWG and PDF, laid over the approved plan if there is one, with every difference measured and listed.

A drone can help with roofs, compound walls and a large site, but it cannot see under roofs or measure to the millimetre, so it supplements the ground survey. The same method scales up to a housing scheme, where the as-built record of roads, drains and plots feeds the plot data a society keeps, as our guide to the Lahore Property Certificate and HSMS shows.

When the drawings and the building disagree

When the building and the approved plan differ, the drawings must show the building, and the difference must be dealt with, not hidden. In Islamabad, regulation 3.12.9 lets CDA require either alterations that bring the work back into line with the approved plan, or amended plans approved after meeting the rules. If the owner does nothing, CDA can stop the work and demolish the part that breaks the rules, at the owner’s cost.

So the order matters. Measure first, list the differences, then decide with your architect which can be regularised by an amended plan and which must be put right on site. Setbacks and plinth level are the differences most likely to matter, because the regulations fix them in feet and inches and the inspector measures them. Our as-built survey service produces that list of differences, in the same coordinates as the design, so the discussion starts from measurements rather than opinions.

How to check an as-built set before you accept it

A good as-built set can be checked in half an hour on site. Before you pay for one, or file one, run these checks:

  • Title block. Does it say as-built (or completion), who measured or marked it up, and the date?
  • Spot dimensions. Pick five dimensions at random (a room, a setback, a window) and tape them. They should agree with the drawing.
  • Levels. Is the plinth level given against the front road, and does it agree with what you see?
  • Changes. Are the changes from the approved plan listed, or does the set look identical to the approved plan? Identical is a warning sign on almost any house.
  • Services. Are buried lines shown with depths and offsets, or with a note that their route is not known? A confident line with no measurement behind it is worse than an honest blank.
  • Formats. DWG for the next designer, PDF for the file, and the print sets the authority asks for.

If you are planning new work on the building, ask for the topographic survey of the plot at the same time: one visit can capture both the building and the ground around it for an architect to design from.

What to send us

We measure existing buildings and draw them as they stand, and we compare finished work with the design. For a house or building in Rawalpindi or Islamabad, send:

  • the address, plot size and number of storeys;
  • the approved plan, if there is one, as a scan or PDF;
  • why you need the drawings (completion, sale, extension, dispute or records);
  • any marked-up drawings the builder left behind.

Send them through our contact page or on WhatsApp, and we will tell you what needs measuring. If the work is still under way, the cheaper path is to record it as it goes, which is part of project supervision.

Want RN Tech Associates to handle this for your site?

Send the location and what the work is for. We reply with the questions that decide scope and price.

Questions

Common questions

01What is an as-built drawing?

It is a drawing of a building or site as it was actually built, showing where the work differs from the approved design. The US federal closeout specification UFGS 01 78 00 defines as-builts as marked-up drawings, kept on site by the contractor, that show actual conditions and deviations from the contract documents.

02Who prepares as-built drawings?

During construction, the builder marks up the drawings as changes happen. At the end, the architect or a surveyor turns those markups, or a fresh measured survey, into a clean set. In Islamabad the completion drawings are signed by the architect who supervised the work, and in Rawalpindi RDA asks for a completion plan stamped by an RDA-registered architect and structural engineer.

03Are as-built drawings required in Pakistan?

For a building that needs a completion certificate, in effect yes. CDA's building regulations ask for six sets of completion drawings, which they call as-built drawings, with the notice of completion. RDA's completion checklist asks for a completion plan in four ammonia prints and two cloth prints.

04Do as-built drawings need to be stamped?

For an authority filing, yes. CDA's regulations say the completion drawings are signed by the architect, and RDA's checklist asks for the stamps of an RDA-registered architect and structural engineer. A set made only for your own records, or for a designer, does not need a stamp, but it should say who measured it and when.

05How do I get as-built drawings for an old house with no drawings?

First ask the authority or the society for the approved plan, if one was ever approved. Then have the building measured: outline, rooms, wall thicknesses, openings, levels, roof, services you can see and the plot lines. The measured survey becomes the as-built drawing, and any difference from the approved plan is listed.

06Is an as-built survey the same as a topographic survey?

No. A topographic survey records the ground before design. An as-built survey records what has been built and compares it with the design, so the differences can be measured and listed.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.