A surveyor in orange hi-vis beside a total station on a gravel embankment by water

Land Surveying

Measured ground truth for every stage of a project

Before design, for an authority file, while it is built and after it is finished: each stage needs the site measured, and each survey uses the same control so the drawings line up.

Underground utilities

How sure is each line?

Our utility plans record how every buried line was found, using the four quality levels of ASCE 38-22. You can see at a glance where a trial hole is worth digging.

  1. QL-D

    Records

    Existing drawings, utility records and verbal accounts.

  2. QL-C

    Surface features

    Visible features (valves, manholes, covers) surveyed and matched to records.

  3. QL-B

    Detected

    Electromagnetic locators and ground penetrating radar trace the line between features.

  4. QL-A

    Exposed

    The utility is uncovered by a test pit and its position and depth measured directly.

Quality levels as defined in ASCE 38-22. Relative confidence, not a percentage.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.