Standards

Measured, checked, then drawn

What we measure with, how we check it, and what you receive. A survey is only worth paying for if you can trust it, so we state our method plainly.

Equipment

The instruments behind the drawings

  • Total stationsAngles and distances for detail surveys, setting out and as-built checks.
  • GNSS receiversSatellite positioning for control points, boundaries and large open sites.
  • LevelsPrecise heights for roads, drainage, floors and bench marks.
  • Utility locators and GPRElectromagnetic locators and ground penetrating radar for buried services.
  • DronesAerial mapping of large open sites, with ground control points.
  • CAD and GIS softwareDrawings, contours, overlays on khasra plans and satellite images.
A total station on a yellow tribrach, trees blurred behind

Method

How a survey earns trust

  1. 01

    Control first

    Each job starts with control points tied to known coordinates. Every later measurement is made from them.

  2. 02

    Independent checks

    Control is checked by closing back on known points; set-out points are checked from a second station or by a second measurement.

  3. 03

    Office checks

    Drawings are checked against the field data and control before delivery.

  4. 04

    Stated limits

    The survey report states the datum, instruments and method, and anything that could not be measured.

Deliverables

What you receive, and in which formats

Drawings
AutoCAD DWG, layered by feature type; PDF sheets at the agreed scale
Points
Coordinate list (CSV) with point codes and descriptions
Surfaces
Contours; surface models (TIN/DEM) on request
GIS
Geo-referenced files for overlays and authority submissions
Coordinates
WGS-84 / UTM (zone 43N for Rawalpindi, Islamabad and Lahore; 42N for Karachi), or the project grid
Reports
Survey report: datum, instruments, method, limits

Utility surveys

How sure is each buried line?

Every line on our utility plans carries its quality level, so you can see what was detected, what was exposed and what comes from records alone.

  1. QL-D

    Records

    Existing drawings, utility records and verbal accounts.

  2. QL-C

    Surface features

    Visible features (valves, manholes, covers) surveyed and matched to records.

  3. QL-B

    Detected

    Electromagnetic locators and ground penetrating radar trace the line between features.

  4. QL-A

    Exposed

    The utility is uncovered by a test pit and its position and depth measured directly.

Quality levels as defined in ASCE 38-22. Relative confidence, not a percentage.

Questions

Accuracy and method

01How accurate are your surveys?

Accuracy depends on the instruments, the method and the purpose, and we agree it with you for each job. What we guarantee is the method: control tied to known coordinates, independent checks, and a report that states how the survey was done.

02Which coordinate system do you use?

WGS-84 with UTM coordinates (zone 43N for Rawalpindi, Islamabad and Lahore, and 42N for Karachi), or the project’s own grid when the client or the design uses one.

03Do you use drones?

For large open sites, aerial mapping with ground control points covers ground quickly. Built-up and tree-covered areas still need instruments on the ground, because a drone cannot see under roofs or canopies.

04What standard do you use for utility surveys?

We record the certainty of each buried line using the quality levels of ASCE 38-22 (QL-D to QL-A). We have not found a Pakistani standard for utility survey quality.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.