What the rules ask for
Every Punjab rule book now asks for the layout plan as a CAD file placed on real coordinates, not only as paper sheets. The wording is almost identical across them, and so is the gap: none says which coordinate system it means.
| Instrument | Stage | What it asks for |
|---|---|---|
| Punjab Development Authorities Private Housing Schemes Rules 2021 (RDA, FDA, GDA, MDA and others) | Application, rule 6(2)(f) | “list of khasra numbers, khasra plan and boundary superimposed on satellite image” |
| Same rules | After the layout is cleared, rule 24(1)(b)(ii) | “a soft copy of layout plan geo-referenced with the appropriate coordinate system”, with the transparency, transfer deed and mortgage deed |
| Punjab Private Housing Schemes Rules 2022 (local governments) | Land status request, rule 5(3) | “document indicating location of Khasra numbers marked on satellite image” |
| Same rules | Application, rule 6(3) | “five hard copies and AutoCAD soft copy of layout plan superimposed on Khasra plan” and a “soft copy of layout plan geo-referenced with the appropriate coordinate system” |
| LDA and TEPA checklist (Lahore) | Application, and final transparency stage | Layout plan “triplicate hard copies, including AutoCAD Drawing”; “Softcopy of Plan geo-referred with appropriate Coordinate System” |
| CDA 2023 regulation, clause 8-C (Islamabad) | Planning documents | Survey and layout plans at not more than 1:1200, aks shajra on the contour plan, layout on the topography plan; no coordinate system stated |
The amendments of 8 July 2026 to the 2021 rules (Punjab Gazette, 15 July 2026) left rule 24(1)(b)(ii) as it was and added rule 6(1a): applications for a new scheme or a revision are now submitted “through the centralized digital approval system”. The direction is clear. Applications in Punjab are moving online (our guide to private housing scheme approval in Punjab covers the 2026 changes), and in Lahore the plots of every scheme now go into PLRA’s system against digital maps, as set out in our guide to the Lahore Property Certificate and HSMS. A layout that cannot be dropped onto a map without stretching causes trouble at each of those steps.
What “the appropriate coordinate system” should mean
No rule defines it, so it is easy to hand in a file that is “geo-referenced” and still does not fit anything. Here is the system we use and recommend, and why. It is our recommendation, not a rule.
WGS 84 / UTM, in metres, in the zone the land falls in. WGS 84 is the datum GNSS receivers and satellite imagery work in. UTM turns it into a flat grid of eastings and northings in metres, so lengths and areas can be measured directly in CAD. Pakistan spans three zones; almost every housing scheme file falls in the two split at longitude 72 degrees east, and zone 41N covers only the far west of Balochistan. The EPSG registry, the standard list of coordinate systems used by GIS and CAD software, gives each a code to write on the drawing:
| Zone (EPSG code) | Longitudes | Cities in it (by our check of their longitude) |
|---|---|---|
| WGS 84 / UTM zone 41N (EPSG:32641) | 60 to 66 degrees E | Gwadar and the far west of Balochistan |
| WGS 84 / UTM zone 42N (EPSG:32642) | 66 to 72 degrees E | Karachi, Quetta, Peshawar, Multan, Bahawalpur, Dera Ghazi Khan |
| WGS 84 / UTM zone 43N (EPSG:32643) | 72 to 78 degrees E | Rawalpindi, Islamabad, Jhelum, Sargodha, Faisalabad, Gujranwala, Lahore, Sialkot |
Two rules of thumb follow. Keep a whole scheme in one zone, even if a corner crosses 72 degrees, and say which zone on every sheet. And never mix: a survey in 43N and a khasra overlay digitised in 42N will sit hundreds of kilometres apart.
One property of the grid matters for the file itself: UTM lengths differ slightly from ground lengths (by our calculation almost nothing in Rawalpindi and Islamabad, about 35 cm per km short in Lahore and about 30 cm per km long in Multan), so the survey report should state the scale factor used and the plot dimensions written on the layout should be ground dimensions.
The same survey control is what makes the whole file line up. The topographic survey for the approval file is done on these coordinates, the layout is drawn on it, and the khasra boundaries are fitted to it, as our guide to the khasra plan and aks shajra shows.
Four ways a “geo-referenced” file goes wrong
Each of these files has coordinates, and each fails when someone overlays it.
- Latitude and longitude in degrees. A drawing in decimal degrees has no fixed unit of length: a degree of longitude is shorter than a degree of latitude, so plots come out stretched and areas meaningless. Use a projected grid in metres.
- A local grid. The surveyor started at 1000,1000 or 0,0 with north “about right”. The drawing is internally fine but sits somewhere in the ocean on a map. This is the most common case, and it can be fixed by surveying common points (below).
- The old Kalianpur datum. Some older Survey of Pakistan sheets and engineering drawings are on Kalianpur 1962, and by our calculation with the EPSG onshore transformation (code 1247) the same point at Rawalpindi or Lahore carries UTM coordinates about 280 m away from its WGS 84 ones, so a file must name its datum, not only its zone.
- A layout drawn in feet. Pakistani layouts are often dimensioned in feet, while UTM is in metres. Moved onto the grid without scaling by 0.3048, a feet drawing is 3.28 times too big. Autodesk’s own help on GIS coordinate systems notes that CAD drawings are “typically unitless”, and AutoCAD takes the drawing unit from its INSUNITS setting, so set the units before assigning a location, not after.
Putting survey coordinates into AutoCAD
This is the step most CAD tutorials cover, and where most swapped or misplaced drawings start. The order that works:
- Set units first. Type UNITS and choose metres for insertion scale (INSUNITS), with enough decimal places to show millimetres.
- Know the axis order. AutoCAD’s X is the easting and Y is the northing, so a point is typed as Easting,Northing, for example 319068.400,3719510.400. Civil 3D’s survey command line asks for northing first (its NE command); mixing the two conventions is the usual cause of a drawing rotated or mirrored across the zone.
- Enter or import points. Type them at the POINT or LINE prompt, paste a list, or import a CSV file of point number, easting, northing, level and code. Keep the original coordinate file with the drawing.
- Do not move the drawing to 0,0. Model space stays at true coordinates. If someone needs a small-number drawing for detailing, give them a copy and say so in its title.
- Assign the coordinate system. In AutoCAD the GEOGRAPHICLOCATION command assigns a projected coordinate system to the drawing; in Civil 3D or Map 3D, assign it in the drawing settings. Choose the UTM zone by its EPSG code.
- Check two points. Use the ID command on two control points and compare with the survey schedule, then measure one known distance.
Overlaying satellite imagery is a good visual check after this, not a source of coordinates. Imagery shows whether the drawing is roughly where it should be; the survey control decides where it actually is.
What to hand over with a housing scheme file
A geo-referenced soft copy is more useful, and easier to check, when it comes with these items. We supply them with every housing scheme survey and recommend asking for them from any surveyor or planner:
| Item | What it contains | Why |
|---|---|---|
| DWG at true coordinates | Survey, khasra overlay and layout in model space, metres | The file the authority and later GIS work from |
| Coordinate system note on every sheet | “WGS 84 / UTM zone 43N (EPSG:32643)”, units, scale factor used | Removes guessing |
| Grid ticks or a coordinate grid on sheets | Eastings and northings at regular steps | Lets a paper copy be checked against the DWG |
| Control schedule | Each control point’s easting, northing and level, with a description and sketch | Lets anyone re-occupy the system on site |
| Boundary pillar schedule | Coordinates of each scheme corner and bend | Ties the boundary to the ground, not only to the drawing |
| Separate layers | Survey, khasra lines and numbers, mouza boundary, scheme boundary, plots, roads and rights of way, open spaces, corridors such as high-tension lines and water channels, contours | Lets each authority or agency switch on what it checks |
| PDF of every sheet | The same content as plotted | The signed record |
| GIS export on request | KML for viewing, or a shapefile of boundary and plots | For digital maps and plot databases |
Layer names are not set by any rule, so agree them at the start and keep them for every revision. A revision that renames layers is harder to compare with the approved version.
How the file gets checked, and why it matters now
A geo-referenced layout makes errors visible quickly, which is the point. When the file is overlaid on imagery, a road that runs through an existing house, a scheme boundary that crosses the neighbour’s khasra or a plot block that sits on a nullah is seen at once. That is far cheaper to see at the planning stage than at demarcation.
Authorities are reading these files. In April 2026, ProPakistani reported that CDA, finding two different layout plans on record for an Islamabad scheme and a shortfall of more than 200 kanal in parks, asked the developer for “the original CDA-approved layout plan, the scheme’s AutoCAD files” and an explanation. A clean DWG, geo-referenced and consistent with the signed sheets, is the sponsor’s own best evidence in that conversation.
Our checks before a soft copy leaves us: control re-observed and agreeing with its schedule; the layout and khasra overlay on the same zone and datum; units in metres; area statement recomputed from the CAD polygons and compared with the sheet, in square feet and in kanal (stating which marla size is used); and a visual overlay on recent imagery. When those pass, the file will behave the same way on an authority’s screen as on ours.
If your layout was drawn on a local grid or in feet, or you have an approved layout only on paper, it can still be put on real coordinates: we survey points that appear both on the drawing and on the ground, fit the drawing to them by moving and rotating it, and report how well it fits. Send the drawings and the khasra numbers through our contact page and we will tell you what the fit needs.