Land surveying

The topographic survey your housing scheme approval file needs

Updated · 11 min read · RN Tech Associates · in Land surveying

Short answer

A housing scheme approval file needs a topographic survey in three copies, drawn to the rules of the authority it goes to. In Punjab it extends 1,000 feet around the scheme (Development Authorities Rules 2021, rule 6(2)(j); Local Government Rules 2022, rule 6(3)); a land sub-division under the 2021 rules is surveyed to its own boundary. In Islamabad, CDA wants a survey plan at a scale of not more than 1:1200 with khasra numbers, spot levels, physical features and 0.5 m or 2 ft contours.

The topographic survey your housing scheme approval file needs

Key points

  • There is no single national specification: the survey follows the rules of the authority the file goes to.
  • Punjab rules ask for the survey to extend 1,000 ft (about 305 m) beyond the scheme boundary, in triplicate.
  • Punjab rules set no contour interval or survey scale; the 0.5 m or 2 ft contours and the 1:1200 survey plan are CDA rules for Islamabad.
  • The survey carries the overlays: khasra boundaries, the layout plan and, in Islamabad, the aks shajra on the contour plan.
  • Both Punjab rule books say an incomplete application is not entertained, so a short or wrong survey stops the file.

Why the survey decides whether the file is complete

The topographic survey is one of the documents a housing scheme file cannot be accepted without. Both Punjab rule books open their evaluation rule with the same sentence: the authority “shall not entertain an incomplete application” (rule 7(1) of the Punjab Development Authorities Private Housing Schemes Rules 2021, and rule 7(1) of the Punjab Private Housing Schemes Rules 2022). The sanction checklist printed with the 2021 rules, Form-H, gives the survey its own yes or no line: “Topographic survey plan extended to a depth of one thousand feet around the scheme area”.

The survey also carries the rest of the file. The khasra boundary is laid on it, the layout plan is drawn on it, and the authority reads the levels, water channels, high-tension lines and access road from it. A CDA letter of 6 March 2026, about a revised and extended layout of 3,251 kanal in Zone 5, shows what a gap looks like: the survey plan, the aks shajra on the contour plan and the layout plan on the topography plan were each marked “Not submitted”, and the sponsor was given 7 days to supply them with the rest of the file or see the request treated as disposed of.

So the survey is a specification job before it is a measuring job. Get the specification from the right rule book first.

Which rules your survey follows

The specification comes from the instrument that governs the land, so start with where the land is. Land a few hundred metres apart, either side of the Islamabad Capital Territory boundary, can fall under two different rule books with two different survey specifications.

Where the land is Instrument What it says about the topographic survey
Punjab, inside a development authority’s area (for example RDA, FDA, GDA, MDA) Punjab Development Authorities Private Housing Schemes Rules 2021, Notification No. SO(H-II)2-5/2015, Punjab Gazette 7 December 2021 Rule 6(2)(j): triplicate copy, extended to a depth of 1,000 ft around the scheme; a land sub-division is surveyed up to its own boundary
Punjab, outside development-authority limits Punjab Private Housing Schemes Rules 2022, Notification No. SOR(LG)8-5/2022, 24 December 2022 Rule 6(3): triplicate copy, extended to a depth of 1,000 ft around the scheme; layout plan also as an AutoCAD and a geo-referenced soft copy
Lahore (LDA) LDA’s own private housing scheme rules have applied LDA’s checklist asks for the topographic survey in triplicate and for cross sections and the right of way of roads abutting the scheme; it states no extent, so confirm with LDA
Islamabad Capital Territory, zones 2, 4 and 5 CDA regulation for private housing schemes, gazette notified 7 July 2023, clause 8-C Three copies of a survey plan at a scale of not more than 1:1200, with khasra numbers, spot levels, physical features and 0.5 m or 2 ft contours

Much of what is published still follows the Punjab Private Housing Scheme and Land Sub-division Rules 2010. The 2022 rules repealed them, with savings only for cases that already held preliminary planning permission. Some municipal checklists still online describe the old preliminary planning permission stage, so check the date and the rule book of any checklist you are handed. The full document list for each authority is in our housing scheme approval documents checklist; the stages themselves, rule by rule with their time limits and fees, are in our guide to private housing scheme approval in Punjab.

Punjab: 1,000 feet around the scheme

The Punjab rules ask for a survey that reaches 1,000 feet (304.8 metres) beyond the scheme boundary on every side. Rule 6(2)(j) of the 2021 rules reads: “triplicate copy of topographic survey extended to a depth of one thousand feet around the housing scheme area; though, for the land sub-division the topographic survey shall be made up to the boundary of the land sub-division”. Rule 6(3) of the 2022 rules uses the same words for the 1,000 feet, but without the sub-division proviso. The 2022 rules treat even schemes of less than 40 kanal as housing scheme types, so read that line as it stands and confirm with the local government before you scope a smaller survey.

The margin lets the authority see how the scheme meets its surroundings: neighbouring levels, existing roads and settlements, drains and nullahs that the scheme will discharge into or cross. It is also where the access road usually is. Rule 7(2)(a)(i) of the 2021 rules sets its minimum width at 50 feet for schemes of 301 kanal and above, 40 feet up to 300 kanal and 25 feet for a land sub-division; the 2022 rules set 40 feet. The rules define right of way as the width between two opposite properties, so measure it property line to property line, not edge to edge of the tarmac.

Why the margin drives the size of the job

On a small scheme, most of the surveyed ground is land you do not own. The table below is geometry, not a quote: square schemes of three sizes, with a band 1,000 feet wide around each (rounded at the corners).

Square scheme (illustration) Scheme area Area inside the 1,000 ft margin, scheme included Times the scheme
1,000 ft by 1,000 ft about 23 acres about 187 acres 8.1
2,000 ft by 2,000 ft about 92 acres about 348 acres 3.8
4,000 ft by 4,000 ft about 367 acres about 807 acres 2.2

Two practical results follow. First, field access to neighbouring land, village paths and other people’s fields has to be arranged before the survey team arrives. Second, a quote that covers only the scheme land is not a quote for the survey the file needs. Ask any surveyor to state the extent in writing, along with the other items in our guide to writing a survey brief you can compare quotes against.

Islamabad: CDA’s survey plan specification

CDA states the survey drawing itself, which the Punjab rules do not. Clause 8-C(ii) of the 2023 regulation, as quoted in CDA’s letter of 6 March 2026, asks for “three copies of survey plan of the site drawn to a scale of not more than 1:1200 showing Khasra numbers, the spot level and physical features such as high-tension lines, water channels, etc. The contours with 0.5 meters or 2 feet interval shall be indicated on the plan.”

  • Scale. Read “not more than 1:1200” as no less detailed than 1:1200. A sheet plotted at 1:2400 does not meet it. If a large scheme will not fit, plot it on several sheets with a key plan rather than shrinking it.
  • Contours. 0.5 metres or 2 feet. Two feet is about 0.61 metres, so a 0.5 m interval satisfies either reading. Why the interval must suit the slope and the scale is explained in our guide to choosing a contour interval.
  • Content. Khasra numbers, spot levels and physical features. High-tension lines and water channels are named; the “etc.” means roads, buildings, graves, wells and anything else on the ground should be there too.

Other items in clause 8-C lean on the survey. Item (i) is a 1:10,000 site plan showing the surroundings within a radius of half a kilometre. Item (v) is the aks shajra of the scheme superimposed on the contour plan, and item (vi) the layout plan superimposed on the topography plan. Item (vii), the layout plan concept report, describes the “existing topographic features”. Item (ix) requires a flood study, vetted by a hydrologist registered with PEC and enlisted with CDA, if the scheme falls within 500 metres of a main water stream, so the survey and site plan should show where the nearest main stream runs.

The heading of clause 8-C says the planning documents are “Duly Signed & Stamped by the Town Planner, duly Registered with PCATP Enlisted in CDA and the Sponsors/Owners”. Agree with your town planner, before the sheets are plotted, how the survey plan will be signed.

What the survey sheets must show

Each instrument names different things, and the gaps matter as much as the requirements. This table sets them side by side.

Item Punjab, DA Rules 2021 Punjab, LG Rules 2022 Islamabad, CDA 2023
Extent 1,000 ft around the scheme; sub-division to its own boundary 1,000 ft around the scheme The site; surroundings within half a kilometre on a 1:10,000 site plan
Copies Triplicate Triplicate Three
Contour interval Not set Not set 0.5 m or 2 ft
Survey sheet scale Not set (scheme plan 1:1200 to 1:2400, location plan 1:4800, rule 9) Not set (same scales, rule 9) Not more than 1:1200
Features named Not listed for the survey; the layout must show scheme boundary dimensions, mouza boundaries and each khasra’s number and boundary Not listed for the survey Khasra numbers, spot levels, high-tension lines, water channels
Overlays Khasra plan and boundary on a satellite image; layout plan on the khasra plan The same, plus the layout plan geo-referenced “with the appropriate coordinate system” Aks shajra on the contour plan; layout plan on the topography plan
Soft copies Soft copy of the approved layout plan at sanction (Form-H) AutoCAD soft copy of the layout plan and a geo-referenced soft copy Not stated in clause 8-C

Where a rule is silent, design for what comes next. The Punjab rules fix the layout plan at 1:1200 to 1:2400, so a survey with too few levels to draw that layout properly will show up as a weak layout later. The 2022 rules want the layout geo-referenced, which only works if the survey under it is on real coordinates. We survey on WGS-84 / UTM coordinates for that reason, so the survey, the khasra overlay and a satellite image line up without stretching.

Lahore and the 2026 changes

Lahore needs its own check. LDA has applied its own private housing scheme rules, and LDA does not publish the rule text online. LDA’s documents checklist, of which a copy is hosted by FDA, asks for the topographic survey in triplicate, the layout plan in triplicate including the AutoCAD drawing, and for TEPA, cross sections and the total right of way of roads abutting the scheme. It does not state the survey’s extent, so ask LDA before you scope.

The Punjab rules are also changing. On 23 July 2026, APP reported from Rawalpindi that amendments to the Punjab Development Authorities Private Housing Schemes Rules had been notified, that applications for approval, extension and renewal must now go only through the Housing Scheme Management System (HSMS), and that RDA’s Chief Planner had been told to enforce them. We have since read the amendment of 8 July 2026 (Punjab Gazette Extraordinary, 15 July 2026): it sends applications for a new scheme or a revision through a centralised digital approval system (rule 6(1a)) and leaves rule 6(2)(j), the 1,000 foot survey, unchanged. Amendments to the 2022 local government rules were also reported in 2026; we have not confirmed their publication in the gazette. Two things follow: check the current text with the authority before the survey is scoped, and keep every survey sheet as both a DWG and a PDF, ready to upload.

Common reasons a survey sends a file back

These are the checks we run on a survey before it goes into a file. Each one ties to a line in the rules quoted above.

  1. The survey stops at the scheme boundary. In Punjab it must reach 1,000 feet beyond it.
  2. One set instead of three. All three instruments ask for triplicate or three copies.
  3. Islamabad sheets at the wrong interval or scale. Contours at 1 m, or sheets plotted smaller than 1:1200, do not meet clause 8-C(ii).
  4. No khasra numbers, or a boundary taken from a wall. The scheme boundary comes from the revenue record (khasra plan or aks shajra, the revenue map of the fields) and must overlay the survey. Where the record and the ground disagree, show it on the drawing; the khasra plan and aks shajra guide sets out the steps.
  5. A local grid. A survey on arbitrary coordinates will not sit on a satellite image or a geo-referenced layout.
  6. Water and power left off. Water channels and high-tension lines are named by CDA, and a main stream within 500 metres triggers a flood study in Islamabad.
  7. The access road not measured. Its right of way, property line to property line, is checked against the minimum width.
  8. An old survey. A survey that no longer matches the ground (new buildings, filled nullahs, a widened road) undermines the layout drawn on it. Re-check it in the field before reuse.
  9. No agreed signature block. In Islamabad the planning documents carry the signature and stamp of the town planner and the sponsors.

Before you commission the survey

Five things let a surveyor scope the job correctly the first time:

  • the location, as a map pin or coordinates, and the authority you expect to apply to;
  • the khasra list and the khasra plan or aks shajra, with the fard (the revenue record of ownership) if you have it;
  • the approximate area, so the scheme type and any sub-division rule can be checked;
  • who your town planner is, and how the sheets will be signed;
  • anything already on the land: buildings, graves, wells, tube wells, power lines.

We scope every housing scheme survey to the specification of the authority the file goes to, and the same survey becomes the base for the housing scheme layout plan. For a single building or a site that is not a scheme, a standard topographic survey is the right job. The rules fix the extent, scale and contours but not the instrument; which method fits which part of your land, from drone mapping on open fields to total station work under orchards, is set out in a separate guide. How the stages fit together, from land check to demarcation, is on our scheme development page. To start, send the khasra numbers and location through our contact page, and we will come back with the extent and the questions that set the scope.

Want RN Tech Associates to handle this for your site?

Send the location and what the work is for. We reply with the questions that decide scope and price.

Questions

Common questions

01How far around the scheme must the topographic survey extend?

In Punjab, 1,000 feet around the housing scheme area. That is rule 6(2)(j) of the Punjab Development Authorities Private Housing Schemes Rules 2021 and rule 6(3) of the Punjab Private Housing Schemes Rules 2022. CDA's Islamabad regulation does not state a margin for the survey plan; the surroundings within half a kilometre go on a separate 1:10,000 site plan.

02What contour interval does CDA require?

Clause 8-C(ii) of CDA's 2023 regulation asks for contours at 0.5 metres or 2 feet on the survey plan. Two feet is about 0.61 m, so a 0.5 m interval meets either reading. The Punjab rules do not set a contour interval.

03Does a land sub-division need the 1,000 ft survey?

Under the 2021 rules for development-authority areas, no: the survey for a land sub-division is made up to the boundary of the sub-division. The 2022 local government rules carry no such exception in the survey line, so confirm with the local government before scoping a smaller survey.

04At what scale is the survey drawn?

For Islamabad, CDA asks for a survey plan drawn to a scale of not more than 1:1200, which means 1:1200 or a more detailed scale. The Punjab rules fix the layout plan at 1:1200 to 1:2400 and the location plan at 1:4800, so the survey should be plotted at a scale that works under the layout.

05Who signs the topographic survey for a housing scheme?

CDA lists the survey plan among the planning documents that are signed and stamped by a town planner registered with PCATP and enlisted with CDA, and by the sponsors. The Punjab rules name the town planner and sponsor as signatories of the location plan and layout plan. Agree the signature block with your town planner before the sheets are plotted.

06Can the same survey be used for the layout plan and the service designs?

Yes, and it should be. The layout plan is drawn on the survey, and the water supply, sewerage and road designs that follow approval are designed on the same levels. One survey on one set of control points keeps every later drawing in line.

→Request a survey

Tell us about the site

Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.

Town, area or a Google Maps link.

Rough size, purpose, deadline. Drawings can follow by email or WhatsApp.