If you own a house plot in Islamabad and want a basement, the rule that governs it is regulation 2.6 of CDA’s Building Control Regulations. It is short and specific. Most web pages on this topic skip it. They quote a society’s own bylaws, a rule for commercial buildings or a news story about a demolition. This guide goes through the house rules clause by clause, in plain English, and shows where owners and designers get caught.
The text below follows the Islamabad Capital Territory Building Control Regulations 2020 as amended by S.R.O. 1074(I)/2023 (Gazette of Pakistan, 16 August 2023). We read regulation 2.6 on its Gazette pages 2539(22) to 2539(25), from CDA’s published copy. Where the 2023 text matches the original 2019 notification, we say so. Feet and inches are the regulation’s own units; metres are our conversions.
The short answer
A dwelling house may have a basement under its whole plinth area. It must stay inside the minimum setbacks. It does not use up floor area ratio (FAR), but CDA still charges fee and property tax on all of it. It must be 8 ft 6 in to 12 ft high inside, have waterproofed RCC outer walls of at least 9 in, pump its sewage up, and have a proper escape. If it touches a neighbour’s ground or building, extra duties apply.
Those are the headline rules. The sections below give the clause number for each, so your architect can check them against the Gazette.
Which rules apply to a house basement
Regulation 2.6.1 covers “basement, vaults, cellars and other structures wholly or partly below the ground level or front road level”. It applies to every building type, with some conditions written specially for dwelling houses. Regulation 2.6.2 adds rules for an open basement, where the side or rear yard is lowered.
In this guide, a house means a dwelling house on a residential plot in the ICT. Flats, apartment buildings and commercial buildings have other conditions, and plots in a private society also need the society’s NOC. See our guide to CDA building plan approval for a house for the filing steps.
Area, depth and how it is counted
How much of the plot can it cover
Regulation 2.6.1(xviii) says basements in dwelling houses are allowed under the entire plinth area of the building. Clause (ix) says that for detached houses, 100% of the permissible ground floor coverage can be used for the basement. Clause (xvi) adds the limit: the basement is built “leaving the minimum permissible setbacks”.
So the basement can be as big as the ground floor footprint, and no bigger.
Does it count in FAR
No. Clause (ii) says the basement area is not counted into FAR or the permissible built up area. Clause (xviii) repeats that it is not counted as a storey. But the same clause (ii) says that “for the purpose of scrutiny fee and property tax all covered area shall be calculated”. A 2,000 sq ft basement adds nothing to your allowed covered area, yet it is part of the area on which the fee is calculated. The current fee rate and what the completion certificate checks are in our guide to the CDA completion certificate.
How far can it show above the road
Clause (i) says the basement must not be exposed more than Schedule-1 allows, measured from the average (mean) level of the front road. The regulation does not set a maximum depth below ground. What it limits is how much of the basement shows above the road level, and the total building height.
Three related clauses matter on sloping plots:
| Clause | What it says | In metres |
|---|---|---|
| 2.6.1(iii) | The natural level of the front yard is not raised or lowered by more than 2 ft from natural ground or road level | 0.61 m |
| 2.6.1(iv) | In a split-level design, a part whose roof is not more than 5 ft above the mean front road level counts as basement and is outside FAR. If a roof is higher than 5 ft, that floor is ground floor area | 1.52 m |
| 2.6.1(v) | On a plot well above the road, the car porch and stair hall may sit at most 2 ft above the road, and the rest may be a basement at road level if it shows no more than 2 ft at the front yard | 0.61 m |
| 2.6.1(vi) | The building must look like two storeys from the front, and its total height must be no more than 30 ft | 9.14 m |
Clause (v) ends with a warning: in such cases “no deviation will be allowed from the approved plan”, and the architect must show both natural ground level and road level on the drawings.
That last point is why levels matter. Every number above is measured from the front road or the natural ground. If the plot has not been surveyed, nobody can show that the design meets them. See our note on why a plot survey comes before house design.
Height, walls and structure
Clause (viii): the clear height of a basement is not less than 8 ft 6 in (2.59 m) and not more than 12 ft (3.66 m), “unless there are special requirements or site condition force for a changed heights”. If the basement is used for habitable purposes, the rules for those room uses apply as well.
Clause (vii): external walls below natural ground or yard level must be at least 9 in (about 230 mm) thick RCC, adequately waterproofed, and “structurally sound and stable against earth pressures”. The regulation gives no column count, no slab thickness and no waterproofing method. Those are for the structural engineer, who signs the design, and for the soil. Islamabad is in a seismic zone, which also affects design; see our guide to the building code and seismic zone.
For an open basement, where the side or rear yards are lowered, regulation 2.6.2(vii) makes an RCC retaining wall at the plot line compulsory.
Setbacks, driveways and open basements
Clause (xiv) is the rule people most often break: “in no case the basement will be allowed in the minimum prescribed set backs.” A basement cannot extend under the front, side or rear setback of a house.
There is one exception. A driveway bridge may be provided in the front or side yard of a plot with a natural depression, and the space under the bridge cannot be used for any habitable purpose. Clause (xvii) adds that on plots in a depression of more than 8 ft, a basement under the front driveway is allowed for storage only.
Regulation 2.6.2 allows an open basement, other than at the front:
- Side and rear yards may be lowered if drainage is proper and the neighbouring properties stay stable. Drainage from the yard is the owner’s sole responsibility.
- The front setback may not be lowered beyond minor levelling of not more than 2 ft from road level.
- Entry from the rear or side setback is allowed, and may serve servants.
- A basement may be used for servant quarters with proper light and ventilation.
Where side yards are lowered, clause (xi) puts the limit at 6 ft from the mean level of the front road.
Sewage, storm water and exits
Sewage and drainage
Clause (xiii): if a bathroom, kitchen or other service is in the basement, the owner must provide mechanical disposal from the basement to the upper level “in all cases”, whatever the level of the CDA mains. This stops back flow if the sewer chokes. Storm water drainage from the basement level must have its own arrangement to the CDA main. CDA states it will not be responsible for the consequences. If a sewer connection is found not connected to the CDA main, the owner and the supervising architect or engineer are held responsible and penalised.
For an open basement, regulation 2.6.2(iii) repeats it: sewage is lifted by mechanical means and disposed of in the CDA main through a sump or sludge pump, and it is the owner’s responsibility.
At completion, CDA inspectors check this. The list in regulation 5.6.8 (original numbering) includes “sewerage connection to CDA sewer mains and proper mechanical system in case of basements”. A pump chamber that was never built is a common reason a completion file stalls.
Exits
Clause (xv): every basement other than an open basement needs at least one emergency exit not smaller than 3 ft by 3 ft (0.91 m), with an outside opening. Clause (xix) adds that a basement needs “proper and adequate means of escape/exits for quick evacuation, in case of emergencies, hazards, and disasters”.
Neighbours and liability
This is the part with real consequences.
Terraced houses. Clause (x): a basement under the plinth is allowed if the adjacent plots are vacant or already have basements. If a neighbour has built on the ground floor but has no basement, leave at least 5 ft (1.52 m) from the property line and design the external wall foundations as cantilevers.
Safety of adjacent structures. Clause (xi): all necessary precautions must be taken when excavating or lowering the side yards, and the owner and contractor must ensure the safety of the adjacent building and boundary walls.
Who pays for damage. Clause (xii): the owner and the contractor are jointly and severally responsible for damage to adjacent property. The architect and engineer are responsible for any defect in the design. CDA is in no way responsible. For buildings other than dwelling houses, the owner must give a bank guarantee at Rs 500 per sq ft of the adjacent building, or bring the neighbours’ NOC.
Exposed neighbouring foundations. Clause (xx): if any underground part of an adjacent building is likely to be exposed by the excavation, the Authority’s prior permission and the NOC of that building’s owner are necessary.
Practically, this means a record of the neighbour’s boundary wall and floor levels before digging starts. A survey of your own plot, with levels on the neighbouring walls, shows what the excavation will meet. If an underground pipe or cable crosses the plot, find it first with a utility survey rather than with the excavator.
What to put on the drawings and what to watch on site
The regulations tie a lot to levels, so the file should show:
- Natural ground level and front road level, with the mean road level used for every limit.
- The basement outline against the minimum setbacks on all sides.
- Clear height, wall thickness and the water proofing type.
- The sewage lifting arrangement and the separate storm water line.
- The exit position and size.
- Neighbouring structures where a terraced plot or an exposed foundation is possible.
CDA’s completion stages include the foundation of the basement and the basement roof level before the slab is poured. Do not pour the slab until the inspection has taken place; our guide to house construction supervision lists the checks. If the setting out is wrong, the basement ends up inside a setback. See setting out a building.
The consequence of occupying without a completion certificate is a fine of Rs 5,000 per month for a residential building in the first year, doubled after that, under regulation 2.8.1 as amended in 2023.
What this guide does not cover
- Flats, apartments and commercial buildings. They have separate conditions in the same regulations and in the zoning rules. Commercial use of a basement needs a separate permission.
- Schedule-1. The exposure limit and height values are in the Schedule and depend on the plot’s category and the allotment letter. Check yours.
- Private society rules. Societies may add their own conditions through their NOC.
- Rawalpindi and Punjab. RDA has its own building regulations; see our guide to RDA building plan approval.
CDA can amend the regulations again. Check the Gazette and CDA’s regulations page before you rely on any number here. This guide explains the rule; it is not legal advice.
Getting a basement designed to pass
If you are planning a house with a basement in Islamabad, we can survey the plot with its levels and neighbouring walls, and our architecture team can prepare drawings that show the basement the way CDA checks it. See architecture and design or send a quote request below.