The code, and why a fit-out has to meet it
The Building Code of Pakistan Fire Safety Provisions 2016 is the national fire code for buildings. The Pakistan Engineering Council (PEC) prepared it with the National Disaster Management Authority, benchmarked against the US NFPA 1 Fire Code 2015. Two notifications of 31 October 2016, S.R.O. 1073(I)/2016 and 1074(I)/2016, published in the Gazette on 22 November 2016, added it to PEC’s bye-laws for engineering works and for consulting engineers. They say three things a fit-out owner needs to know:
- Construction and modification of buildings in violation of the Provisions is a violation of professional engineering work under the PEC Act.
- The bye-law applies to new and existing buildings. Existing buildings had three years from notification to comply, and one year for the minimum: fire alarm and detection, extinguishers, emergency response plans and fire drills.
- Enforcement rests with the “Authority Having Jurisdiction” (AHJ): development authorities, district, tehsil and municipal administrations, cantonments and others, each within its own area.
The code then closes the gap most tenants assume is there. Clause 1.3.6.3: “Repairs, renovations, alterations, reconstruction, change of occupancy, and additions to buildings shall conform to these Provisions.” A plaza that was approved years ago does not make your new partitions, ceiling and shutter compliant. A house or flat turned into an office or clinic is a change of occupancy.
First, classify the space
Almost every number in the code depends on the occupancy class (Chapter 5). For fit-outs, four matter:
| Your space | Occupancy class | Definition in the code |
|---|---|---|
| Shop, showroom, pharmacy, salon selling products | Mercantile (5.1.9) | Display and sale of merchandise |
| Office, bank branch, consultancy, day clinic (see below) | Business (5.1.10) | Transaction of business other than mercantile |
| Restaurant, cafe, hall, gym with 50 or more people | Assembly (5.1.2) | Gathering of 50 or more persons |
| Hospital, clinic keeping four or more patients | Health care (5.1.5) | Treatment or care of four or more patients |
Clinics are where the code is unclear. Chapter 5 defines health care as treatment of four or more patients “simultaneously”. Chapter 3 (3.3.157.10) adds “on an inpatient basis”, for patients mostly incapable of self-preservation. A walk-in GP, dental or physiotherapy clinic therefore usually sits with business, and the finish table groups “Business and Ambulatory Health Care” together. Clause 5.1.1.1 gives the authority the final word where classification is in question, so settle it before the layout is drawn.
Then work out the occupant load: floor area divided by the factor in Table 10.10.2.1. Offices are 9.3 square metres per person; a shop’s sales floor at street level is 2.8, and 5.6 on upper floors; outpatient health care is 13. A 200 square metre office is designed for 22 people; a 100 square metre ground-floor shop for 36. That number sets exit widths, alarm thresholds and drill duties.
Where shops and offices share a building, each part is classified by its use and the building meets the most restrictive requirements, unless the occupancies are separated by 2-hour fire-rated construction (1 hour if sprinklered). A small area under 10% of the main occupancy’s area may be treated as part of it (5.1.13).
Exits, doors and corridors
Exits are where fit-outs most often go wrong, because partitions, counters, shutters and access control all sit on the escape route.
| Requirement | Clause | What it means on site |
|---|---|---|
| At least two means of egress from every storey or portion | 10.11.2 | A deep shop or office with one door at the front needs a second way out |
| Travel distance to an exit: 30 m for business and mercantile | Table 10.11.1 | Up to 45 m if the building is fully sprinklered |
| Dead-end corridors no longer than half the travel distance | 10.12.2.2 | No long cul-de-sac behind the stock room |
| Two exits at least half the area’s diagonal apart (a third if sprinklered) | 10.12.4.2 to 10.12.4.3 | Two doors side by side count as one |
| Door clear width at least 810 mm | 10.9.1.4.2 | Measured with the door open at 90 degrees |
| Side-hinged or pivoted doors, swinging in the direction of exit | 10.9.1.5 | Sliding or rolling doors only for business areas of 10 people or fewer |
| Openable from inside without a key, tool or special knowledge | 10.9.1.8.1 to 10.9.1.8.2 | No padlock inside while the space is occupied |
| Corridor at least 1,200 mm clear where 50 or more people use it | 10.10.2.5.2 | 915 mm minimum width for other egress routes |
| Exit access not through kitchens, store rooms, toilets or lockable rooms | 10.12.5.1 | The fire exit cannot be through the stock room |
Three details catch fit-outs out. Rolling security shutters and grilles on an exit are allowed only in existing occupancies, fully open during business hours, with the sign the code prescribes (10.9.1.5.3). Electrically locked and access-controlled doors must release on loss of power, open with one hand, and have a “PUSH TO EXIT” release 1,015 to 1,220 mm above the floor and within 1,525 mm of the door, unlocking automatically when the alarm or sprinklers operate (10.9.1.8.4 and 10.9.1.8.9). And mirrors may not be placed on exit doors, nor curtains hung over them (10.8.2.2, 10.12.5.3).
Table 10.9.1.8.13 also lists door fire ratings by location, among them an office main entrance at 60 minutes, smoke-proof and self-closing, and exit corridor doors at 60 minutes. A frameless glass office entrance off a common corridor needs that question answered by the building’s engineer before it is ordered. Stairways may not hold gas piping or electrical panels (10.16.4).
Finishes, furniture and signs
Interior finish is where interior design and fire safety meet. Wall and ceiling finishes are classed by flame spread index under ASTM E 84 or UL 723 (8.4.4.3): Class A is 0 to 25, Class B 26 to 75, Class C 76 to 200, all with a smoke developed index up to 450. Partitions, panelling and wall pads count as interior finish, not furniture (8.4.2.5).
| Occupancy (Table 8.4.3.1) | Exits | Exit access corridors | Other spaces |
|---|---|---|---|
| Business and ambulatory health care | A or B | A or B | A, B or C |
| Mercantile | A or B | A or B | A or B |
| Health care | A | A (B on lower part) | A (B in small rooms) |
| Assembly, 300 people or fewer | A | A or B | A, B or C |
Two cautions. For shops the table says A or B everywhere, while clause 14.12.3.2 allows A, B or C for new wall and ceiling finish; specifying A or B satisfies both. And textile wall and ceiling coverings and expanded vinyl must meet Class A, while foamed plastics are allowed as finish only if the authority approves (8.4.5). Health care occupancies of one or two storeys are exempt from the finish rules (14.4.1.2). Posters and paper on walls may cover no more than 20% of the wall area (8.4.2.7.1).
Exits need an approved sign readable from any direction of approach, with no point in an exit access corridor more than 30 m from a sign (10.15). Emergency lighting must come on within 1 second of a power failure, give at least 10 lux on the centreline of the escape route at floor level, run for at least 1 hour 30 minutes, and be tested monthly for 30 seconds and yearly for 1.5 hours if battery powered (10.14).
Extinguishers, alarms and sprinklers
What a fit-out must provide depends on the occupancy and the size of the space or building.
| System | Shop (mercantile) | Office or day clinic (business) | Clause |
|---|---|---|---|
| Portable extinguishers | Always; at least 2-A rating; within 22.9 m travel | Always; same rule | 9.6.1.2, Table 9.6.3.2.1.1 |
| Fire alarm and detection | Class A mercantile: over 2,800 square metres or more than three sales storeys | Three or more storeys, or 50 or more people above or below the exit level, or 300 or more in total (new) | 9.7.2.21, 9.7.2.23 |
| Automatic sprinklers | New shops of three or more storeys or over 1,115 square metres; sales basements over 232 square metres | No general threshold; required if the building is high-rise | 9.3.2.20, 9.3.2.23 |
| Any building | Basements over 232 square metres (new); high-rise (over 18 m with lifts) also needs a voice alarm | Same | 9.3.2.2, 3.3.25.6, 9.7.2.27 |
Extinguishers weighing up to 18.14 kg are mounted with the top no more than 1.53 m above the floor and the bottom at least 102 mm clear of it, in plain view along the normal path of travel (9.6.3.1.3). Choose the type for the hazard: Class K for commercial cooking, and units listed for Class C for server and electronic rooms, where dry chemical units are not to be used (9.6.2.5). Staff in shops and offices must be periodically trained in using them (14.12.2.3, 14.13.2.3).
If the building already has sprinklers or detectors, the fit-out must keep them working: new partitions and ceilings change coverage, so the system’s designer has to check the layout. The authority may require construction documents and a permit before any fire protection system is installed or modified (9.1.1).
During the works
Chapter 11 covers alterations as well as new construction. The owner names one person responsible for fire prevention on site; combustible waste and debris go out daily; oily rags go in an approved container; an extinguisher sits at each usable stairway on every floor once combustible material accumulates; and “temporary protective coverings used on fire protection devices during renovations, such as painting, shall be removed promptly” (11.3.2.3.5), so check every detector head at hand-over. If a fire protection system is out of service for more than 4 hours in 24, a fire watch is required (9.1.8).
Who enforces it in Islamabad and Rawalpindi
Islamabad. Clause 4.1.18 of CDA’s Building Control Regulations 2020, as amended by S.R.O. 1074(I)/2023, says the 2016 Provisions “shall be followed”, that fire safety drawings and certification must follow them, and that installed fire safety equipment must be certified by the relevant authority every year, with the certificate posted in the building. The older Islamabad Fire Prevention and Life Safety Regulations 2010 (S.R.O. 70(I)/2011) remain on CDA’s list: they let CDA’s nominated officer inspect after three hours’ notice (regulation 3), require fire and life safety clearance for new buildings at plan approval and again at the completion certificate (4(3); for a house, see the CDA completion certificate guide), and set fines of up to Rs. 500,000, plus up to Rs. 3,000 a day for a continuing offence (9). On 30 August 2026 CDA said its Fire and Emergency Services Directorate had sealed five buildings and fined three hospitals for failing fire and life safety observations.
Rawalpindi. The authority depends on where the premises are: the development authority, the municipal administration or a cantonment board, all of which are named as AHJs in the 2016 bye-law. Ask the one for your building which documents it wants for a fit-out before work starts.
A fit-out checklist
- Classify the occupancy and compute the occupant load from the measured floor area.
- Draw both exits, the travel distances and the door swings on the layout before choosing finishes.
- Check every shutter, glass door and access-controlled door against clauses 10.9.1.5 and 10.9.1.8.
- Specify finishes by class, with test evidence for textiles, vinyl, foam and panelling.
- Place exit signs, emergency lighting and extinguishers on the drawings, not on site.
- Ask the building’s engineer whether alarm or sprinkler coverage changes with your layout.
- Name the person responsible for fire safety during the works, and uncover detectors at hand-over.
Our interior design work starts from a measured plan of the existing space and draws the escape routes, door hardware and finish classes into the layout and schedules, so the fit-out contractor builds them in rather than adding them after inspection. For an existing unit with no drawings, an as-built survey gives that plan. If you are agreeing a fit-out contract, our guide to what a construction contract should say applies to shops and offices too, and the structural side of the same CDA regulations is explained in our guide to the seismic zone of Islamabad and Rawalpindi. The work itself can be checked against the drawings through project supervision. To plan a shop, office or clinic fit-out, send the unit’s location, area and intended use through our contact page.