Free tool
Housing scheme land use checker for Punjab
Enter the scheme area and the rule book that governs the land, and this checker shows the open space, graveyard, public building and commercial shares rule 10 requires, the land left for plots, and whether your planned figures pass.
Check a scheme's land uses
150 kanal under the 2022 rules: Housing scheme, 100 to under 300 kanal. 4 of 4 planned shares meet the rules.
- Size bandHousing scheme, 100 to under 300 kanalRule 3; Rule 10(1)(a)
- Reserved before roads16.5 kanal (11%)Open space, graveyard and public buildings at their minimum
- Most commercial7.5 kanal (5%)Commercial is a ceiling, never a target
- Maximum saleable area97.5 kanalGross area, less the minimum reserves and your roads.
Your planned uses add up to the whole scheme, 150 kanal.
| Land use | The rule asks | For this scheme | Your plan | Result |
|---|---|---|---|---|
| Open space, parks and playgroundsRule 10(1)(a), row 1 | At least 7% | At least 10.5 kanal | 10.5 kanal (7%) | Meets the rule |
| GraveyardRule 10(1)(a), row 2 | At least 2% | At least 3 kanal | 3 kanal (2%) | Meets the rule |
| Public buildingsRule 10(1)(a), row 4 | At least 2% | At least 3 kanal | 3 kanal (2%) | Meets the rule |
| CommercialRule 10(1)(a), row 3 | At most 5% | At most 7.5 kanal | 7.5 kanal (5%) | Meets the rule |
| RoadsRule 10(1)(a), rows 6 and 9 | No share set; widths are | Internal roads at least 30 ft, major road at least 80 ft, right of way | 36 kanal (24%) | Check the widths on the plan |
| ResidentialRule 10(1)(b) | No share set; at least 20% of it for apartments or 3 to 5 marla plots | At least 18 kanal of your residential area in small plots or apartments | 90 kanal (60%) | Plan the small plots inside it |
| Resident parkingRule 10(1)(a), note to the table | Only for apartment schemes | – | – | – |
How the checker works
It does what an authority's planning officer does with the area statement on a layout plan, in four steps.
- The rule book. Land outside a development authority's limits follows the Punjab Private Housing Schemes Rules 2022; land inside RDA, FDA, GDA, MDA or another Punjab authority's notified area follows the Punjab Development Authorities Private Housing Schemes Rules 2021.
- The size band. Each table has a column per type and size: rule 3 of the 2022 rules sets the bands; the 2021 rules call anything under 100 kanal a land sub-division (rule 2(1)(q)).
- The shares. Rule 10 sets open space, graveyard and public buildings as minimum shares and commercial as a maximum, each as a percentage of the gross area. The checker multiplies them by your area.
- Your plan. Each planned figure is compared with its limit and marked as meeting the rule, short or over. Roads and residential have no share, so they are shown with the rule that does apply to them.
The maximum saleable area is the gross area less the minimum open space, graveyard, public buildings (and resident parking in apartment schemes), and less your roads once you enter them. The rules count a little more as saleable: public building plots under the 2021 rules (rule 2(1)(aa)), or the saleable share of the public building area under the 2022 rules (rule 2(1)(bb)), so the authority's figure can be higher by that share.
The shares in the 2022 rules
Rule 10(1)(a), rows 1 to 4, for land outside the development authorities' limits:
| Type and size | Open space | Graveyard | Public buildings | Commercial |
|---|---|---|---|---|
| Housing scheme under 40 kanal | Nil | Nil | Min 1% | Max 5% |
| Housing scheme, 40 to under 100 kanal | Min 5% | Min 2% | Min 2% | Max 5% |
| Housing scheme, 100 to under 300 kanal | Min 7% | Min 2% | Min 2% | Max 5% |
| Housing scheme, 300 to under 500 kanal | Min 7% | Min 2% | Min 3% | Max 7% |
| Housing scheme, 500 kanal and above | Min 7% | Min 2% | Min 3% | Max 10% |
| Farm housing scheme | Min 7% | Min 2% | Min 2% | Max 5% |
| Apartment housing scheme | Min 10% | Min 2% | Min 3% | Max 5% |
The shares in the 2021 rules
Rule 10(a), rows 1 to 4, read from the Punjab Gazette of 7 December 2021 (pages 2741 and 2742). The amendments of 8 July 2026 changed the plot size row and added a row for a waste water treatment plant, but none of these shares.
| Type and size | Open space | Graveyard | Public buildings | Commercial |
|---|---|---|---|---|
| Land sub-division under 40 kanal | Nil | Nil | 2% to 10% (not compulsory) | Max 2% (not compulsory) |
| Land sub-division, 40 to under 100 kanal | Min 5% | Nil | 2% to 10% | Max 3% |
| Private housing scheme, 100 to under 300 kanal | Min 7% | Min 2% | 2% to 10% | Max 5% |
| Private housing scheme, 300 to 500 kanal | Min 7% | Min 2% | 3% to 10% | Max 5% |
| Private housing scheme above 500 kanal | Min 7% | Min 2% | 3% to 10% | Max 10% |
| Farm housing scheme | Min 5% | Min 2% | 2% to 10% | Max 5% |
| Low cost apartment housing scheme | Min 5% | Min 3% | 2% to 10% | Max 2% |
Public buildings are a range under the 2021 rules, so the authority settles the share inside it; the 2022 rules set only a minimum.
What the checker does not check
A layout that passes every share can still be returned. These rules are checked on the drawing, not in the area statement:
- road widths as drawn, plot sizes, the service area or society office, and the solid waste site (rule 10, rows 5 to 10);
- at least ten trees per kanal of gross area, four foot footpaths on roads of 60 feet and more, and parking strips in front of commercial areas;
- a place of worship, and a graveyard outside the scheme only within 5 km on the sponsor's own land;
- under the 2021 rules, one percent more open space, graveyard and public buildings for every ten percent slab of extra apartments (rule 10(b)(h));
- under the 2022 rules, the relief for land under high tension lines, and mixed schemes, which are planned as separate blocks, each meeting its own column.
Every row of both tables, with a worked area statement, is in our guide to planning standards for housing schemes in Punjab. When you are ready for the drawing itself, our housing scheme layout plan service prepares it with the area statement. To price the approval, try the approval fee calculator; if your area is in acres or square feet, the land area converter turns it into kanal, and all three are on our free tools page.
Amendments to the 2022 rules were approved by a cabinet committee in June 2026, as reported in the press. We had not seen them in the gazette when we checked on 4 November 2026, so the 2022 figures follow the rules as published on the Local Government Department's compendium. Ask the authority for its current standards before the layout is fixed.
Want the layout drawn to pass the first time?
Send the location, the area and what the work is for. We reply with the questions that decide scope and price.
Questions
Common questions
01What percentage of a housing scheme must be open space in Punjab?
Under the 2022 rules, at least 7% for schemes of 100 kanal and above and for farm housing, 5% from 40 to 100 kanal, none under 40 kanal, and 10% for apartment schemes. Under the 2021 rules for development authority land, at least 7% for a private housing scheme, 5% for farm housing, a land sub-division of 40 to 100 kanal and a low cost apartment scheme, and none under 40 kanal.
02How much of a housing scheme can be sold?
The rules set no single figure. Saleable area means the residential and commercial area plus the public building plots (2021 rules, rule 2(1)(aa)) or the saleable share of the public building area (2022 rules, rule 2(1)(bb)). The checker shows the most land left for residential and commercial plots once the minimum open space, graveyard and public buildings and your roads are taken out. Under the 2022 rules, twenty percent of the saleable area (ten percent of the saleable plots in farm housing) is then mortgaged as security for the development works.
03Is there a minimum percentage for roads in a housing scheme?
No. Neither table sets a road share. The rules set widths instead: internal roads of at least 30 feet in most schemes (40 feet in farm housing under the 2022 rules, 20 feet in a low cost apartment scheme under the 2021 rules) and a major road from the entrance of 30 to 150 feet, depending on the type and size of the scheme. Road area is whatever those widths take on your layout.
04Which rules apply to land in Rawalpindi?
Land inside the Rawalpindi Development Authority's limits follows the 2021 development authority rules; RDA publishes the revenue estates (mouzas) inside its limits. Land outside an authority's limits follows the 2022 local government rules. Lahore (LDA) and Islamabad (CDA) have their own rules, which this checker does not cover.
Sources
- Punjab Private Housing Schemes Rules 2022, rules 2(1)(bb), 3 and 10, Notification No. SOR(LG)8-5/2022 (Local Government and Community Development Department compendium)
- Punjab Development Authorities Private Housing Schemes Rules 2021, rules 2(1)(q), 2(1)(aa) and 10, Punjab Gazette (Extraordinary), 7 December 2021, pp. 2735 to 2744 (FDA copy)
- Amendments to the Punjab Development Authorities Private Housing Schemes Rules 2021, Notification No. SO(H-II)2-5/2015 of 8 July 2026, Punjab Gazette (Extraordinary), 15 July 2026 (RDA copy)
- Rawalpindi Development Authority: detailed territorial jurisdiction by revenue estate (mouza)
Sources read on 4 November 2026. Rules and fees change: the authority's current notification decides, so check it before you file. This tool gives general information, not advice on your land.
→Request a survey
Tell us about the site
Location, rough size and what you need it for. We reply with the questions that decide the scope and the price.
- WhatsApp0333 5678592
- Call0333 5678592
- Emailinfo@rntechassociates.com
Enquiry sent
Thank you. Your enquiry has been sent.
Your reference
A confirmation is on its way to your email. If you do not see it in a few minutes, please check your Spam folder.
We will reply by email or WhatsApp with the questions that decide the scope and the price.