Two apartment scheme categories, not one
An apartment housing scheme in Punjab is a scheme laid out for apartment buildings rather than individual house plots, and the province’s two rule books treat it in opposite ways. Which one applies depends on where the land is, as our guide to private housing scheme approval in Punjab explains.
| 2022 rules (local government land) | 2021 rules (development authority areas) | |
|---|---|---|
| Name in rule 3 | Apartment housing scheme | Low cost apartment housing scheme |
| Size limit | At least 25 kanal | At most 100 kanal (the standards column heading) |
| Apartment or unit size | Not set in the scheme rules | At most 3 marla per apartment |
| Building height | Not set in the scheme rules | At most 60 feet |
| Site or block size | Blocks of at least 2 kanal | Plots of at least 10 marla |
| Internal roads | At least 30 feet | 20 feet |
| Major road from the entrance | At least 40 feet | 40 feet |
| Residents’ parking | At least 2% of the total area | At least 2% of the total area |
The 2022 category is about scale: a minimum area so that an apartment scheme has room for its own open space, services and parking. The 2021 category is about cost: a ceiling on area, unit size and height, and narrower roads, for a scheme aimed at lower incomes. The rules define “low cost housing” as quarters, combined houses, flats or apartments for a low income group, and the low income group as people whose monthly income does not exceed Rs 25,000, a figure fixed in 2021. The parts of the rules we read do not say how a sponsor shows that buyers meet it, so ask the authority.
At 272 square feet a marla (225 in Lahore district), the 3 marla cap is 816 square feet per apartment outside Lahore and 675 square feet in Lahore district.
The full columns of both standards tables, for every scheme type, are in our guide to planning standards for housing schemes in Punjab. This page is about what is particular to apartments.
A 25 kanal apartment scheme under the 2022 rules
Take the smallest apartment scheme the 2022 rules allow, 25 kanal on local government land. One kanal is 20 marla.
| Item | 2022 rule | For 25 kanal |
|---|---|---|
| Park, open space, playground | Min 10% | 2 kanal 10 marla |
| Graveyard | Min 2% | 10 marla |
| Public buildings | Min 3% | 15 marla |
| Residents’ parking | Min 2% | 10 marla |
| Solid waste site | Min 5 marla | 5 marla |
| Service area or society office | Min 5 marla | 5 marla |
| Commercial | Max 5% | Up to 1 kanal 5 marla |
| Apartment block | Min 2 kanal each | Each block site |
Before a road is drawn, 4 kanal 15 marla, or 19% of the land, is committed to public and service uses. Compare an ordinary 25 kanal plot scheme, which falls in the under 40 kanal band: no fixed open space or graveyard, public buildings of at least 1% and the same two 5 marla sites, about 3% in all. The apartment category asks for much more land up front, because many more people will live on it.
Half of the minimum public building area, 7.5 marla here, is transferred free with the roads, parks and graveyard; the rest is the saleable share. How that works, and how the mortgage of 20% of the saleable area then takes some apartment blocks out of sale until the services are built, is set out in our guide to saleable area in a Punjab housing scheme. In an apartment scheme the mortgage falls on whole block sites, so decide early which blocks will be mortgaged and phase construction around them.
A low cost apartment scheme under the 2021 rules
Inside RDA, FDA, GDA, MDA or another authority’s area, take 60 kanal planned as a low cost apartment housing scheme.
| Item | 2021 rule | For 60 kanal |
|---|---|---|
| Open space | Min 5% | 3 kanal |
| Graveyard | Min 3% | 1 kanal 16 marla |
| Public buildings | 2% to 10% | 1 kanal 4 marla to 6 kanal |
| Residents’ parking | Min 2% | 1 kanal 4 marla |
| Commercial | Max 2% | Up to 1 kanal 4 marla |
| Internal roads | 20 feet | 20 foot right of way |
| Major road from the entrance | 40 feet | 40 foot right of way |
| Plots, apartments, height | Plot min 10 marla, apartment max 3 marla, height max 60 feet | Same |
At the public building minimum, 7 kanal 4 marla, or 12% of the land, is committed before roads. The column sets no service area, solid waste site or grid station. The 20 foot internal roads are the narrowest in either rule book, which keeps road area down but leaves little room for parking on the street, one reason the 2% parking area matters.
The access road to the site follows the general rule: since 8 July 2026, rule 7(2)(a)(i) of the 2021 rules, as amended (Punjab Gazette, 15 July 2026), asks for a carpeted or metalled road or an existing revenue path at least 20 feet wide in the revenue record, with a setback in front of the scheme so that the effective width is at least 50 feet. Development works must be finished within two years for schemes up to 100 kanal, the same period as in the 2022 rules.
Apartments inside an ordinary housing scheme
Most apartments in Punjab schemes are not in apartment schemes at all. They sit on apartment sites inside ordinary plot schemes, and the rules treat them differently there.
- The 20% rule. In ordinary schemes of 40 kanal and above, at least 20% of the residential area goes to apartments, plots of 3 to 5 marla, or both. Apartment schemes, farm housing and the 2021 low cost apartment scheme are exempt, because they are already dense.
- More apartments, more open space (2021 rules). In a development authority’s area, giving more area to apartments raises the minimum open space, graveyard and public building shares by one percent for every ten percent slab of apartments. The road serving the apartments must not be a dead end, and the access road rises to 60 feet for a housing scheme. Our standards guide covers this in the other requirements in rule 10 of the 2021 rules.
- Apartment sites on the plan. An apartment site is defined in the 2021 rules as a site earmarked for an apartment building. On the layout plan it is a numbered plot like any other, with its size and dimensions, as our guide to what a housing scheme layout plan must show explains.
Questions the rules leave open
Three points are not settled by the text, and each changes the cost of a small apartment scheme. Ask the local government or authority before the layout is fixed.
- Services designs under 40 kanal. The 2022 rules excuse a “housing scheme having an area less than forty kanal” from full services designs, asking instead for internal infrastructure and septic tanks where there is no public sewer. Rule 3 lists the apartment scheme as a separate type, so do not assume a 30 kanal apartment scheme gets that relief. With dozens of households on each block, full water and sewerage designs will be needed anyway.
- The locked-land test under 100 kanal. Rule 7 of the 2022 rules evaluates a “housing scheme less than hundred kanal” only if the sponsor owns no adjoining land and the land is locked in. Whether the authority applies that to an apartment scheme of 25 to 99 kanal is not stated. If you own land next to the site, raise it before filing.
- The buildings themselves. The 2022 approval letter (Form D) says buildings are built only after building plans are approved under the prevailing building and zoning regulations. Height, coverage and setbacks for apartment blocks come from those regulations, which this page does not cover; the 2021 low cost category adds its own 60 foot limit on top.
Selling apartments before and after approval
Apartments are often sold off plan, and the scheme rules reach those sales. Neither rule book allows plots or housing units to be advertised or sold before the scheme is approved, and an advertisement needs the authority’s no objection certificate. The advertisement must state the total area, the number of residential and commercial plots, the public building sites, the mortgaged plots, the completion period and the approval number and date.
Each booking needs a registered agreement. It must give the date of possession, and if possession is late the sponsor pays the buyer 2% per month of the amount paid. If the buyer defaults and the allotment is cancelled, 10% of the price (of the price paid, in the 2022 wording) is deducted and the rest is refunded within six months. These protect buyers of apartments as much as buyers of plots.
What changed in 2026
Inside development authority areas the 2021 rules were amended on 8 July 2026 (Punjab Gazette, 15 July 2026): rule 3 gained a “low cost housing scheme” category, which follows the standards of its size category except for 20 foot internal roads, 15 foot streets no longer than 150 feet, major roads of 30, 40 or 50 feet by size and a 15 foot parking strip in front of commercial areas. The low cost apartment housing scheme described above is unchanged. On local government land, a Punjab cabinet committee approved amendments to the 2022 rules in June 2026. The News reported four categories, including apartment schemes of at least 25 kanal and a separate category of low-cost housing schemes, with open space of at least 10% in apartment projects. The amendments take effect once published in the gazette, and we have not seen the notified text, so the low-cost category’s limits are not known. Government affordable apartment programmes announced in the same period are public projects, not private schemes under these rules.
We plan apartment schemes and apartment sites inside plot schemes on the housing scheme layout plan service, with the block sites, parking, open space and roads tested against the rule book that governs the land. The fees that follow are worked through in housing scheme approval costs in Punjab. Send the location and area through our contact page and we will tell you which apartment category the land can take.